Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-AOC N A | PALWAL | HARYANA | 121004 | ₹4.1 L | 1 | Accepted-AOC Due to L1 |
| 2 | 2₹4.2 LRejected-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 172029 | ₹4.2 L | 2 | Rejected-Finance Due to L2 |
| 3 | 3₹5.1 LRejected-Finance | ₹5.1 L | 3 | Rejected-Finance Due to L3 |
| 4 | 4₹5.5 LRejected-Finance | ₹5.5 L | 4 | Rejected-Finance Due to L4 |
| Sl No | Description | Qty | Unit | Ajay Kumar Bassi L1 | Ram Ji Dass L4 | Hardeep Singh L2 | Akash Singh L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation , trecnches including jungle clearance (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing of pumping out water, blasting soft/ hard rock or chiselling soft. Hard rock where blasting is prohibited all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring srtutting, planking, timbering and dewatering wherever required, stacking the usable and un-usable material/soil separately and after laying, jointing and testing of pipes returning the usable soil to trenches in 15cm (fifteen centimeters) layers including consolidating of such deposited layer by ramming and watering and then disposing of all of all surplus soil un-usable materials as directed within all leads and lifts including rstoration of un-matalled surfaces to its original condition and also i/c cost of diversion of traffic, night signals, fixing caution boards crossing over trenches for access to houses, etc. complete in respects with all leads and lifts as per directed of Engineer-in-charge of the site of work.( Pick Jumper Work) | 30.38 | Cum | 140 ₹4,253.20 | 240 ₹7,291.20 | 150 ₹4,557 | 190 ₹5,772.20 |
| 2.00 | Providing and laying cement concrete 1:6:12 mix (one cement :Six sand :twelve stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in Retaining wall as per direction of Engineer- in-Charge with in all lead & lifts. | 10.13 | Cum | 2,850 ₹28,870.50 | 4,500 ₹45,585 | 3,000 ₹30,390 | 3,500 ₹35,455 |
| 3.00 | Providing and laying cement concrete 1:4:8 mix (one cement :Four sand :Eight stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in Retaining wall as per direction of Engineer- in-Charge with in all lead & lifts. | 60.75 | Cum | 3,480 ₹2.1 L | 4,500 ₹2.7 L | 3,800 ₹2.3 L | 4,500 ₹2.7 L |
| 4.00Providing form work with steel plates 3.15milimetres thick welded with angle iron in frame 30x30x5mm So as give a fair finish including centring shuttering , strutting and propping etc. with wooden battans & ballies, height of propping & centring below supporting floor to celing not exceeding 4.00 metres & removal of the same for in situ reinforced concrete & plain concrete work in :- | |||||||
| 5.00 | Vertical surface such as wall (any thickness) partitions walls & the like including the attached pillaster,s buttresses plinth string courses & the like as per the direction of the engineer-in-charge with in all lead & lifts. | 225 | Sqm | 190 ₹42,750 | 340 ₹76,500 | 200 ₹45,000 | 190 ₹42,750 |
| 6.00 | Providing & fixing galvanised mild steel barbed wire (IS: 278-1962 Type-I) weightng 9.38 Kgs per 100 metres (minimum) straining and fixing to any type of standard rails straining bolts including securing with and provision of galvanised mild steel wire stapples or steel pipe etc. complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge with in all leads and lifts. | 8,100 | Mtr | 14.5 ₹1.2 L | 16 ₹1.3 L | 12 ₹97,200 | 17 ₹1.4 L |
| 7.00 | Fixing of RCC Fencing Post | 90 | No. | 20 ₹1,800 | 30 ₹2,700 | 25 ₹2,250 | 20 ₹1,800 |
| 8.00 | Steel work welded in built up sections, trusses and framed work including cutting,hoisting fixing in position and applying a priming coat of red lead paint in grating framed guard bars,ladders railing, brackets and similar work including all leads and lifts complete. | 105.73 | Kg | 80 ₹8,458.40 | 97 ₹10,255.81 | 75 ₹7,929.75 | 120 ₹12,687.60 |
Tender Value
₹6.4 L
EMD Value
₹12,894
Closing Date
28 Jul 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Amb
SUB HEAD Providing and fixing of Barbed wire fencing (Boundary wall) in the Campus of Jowar Mairi Ph-1st
2025_HPIPH_110359_1
EE-JSD-Amb-Tender 28.07.2025-Job-5
Open Tender
Civil Works
Amb
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
EE JSD Amb
₹12,894
1 Jan 2026
18 Jul 2025
28 Jul 2025
18 Jul 2025
28 Jul 2025
18 Jul 2025
Amount
Excavation in foundation , trecnches including jungle clearance (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing of pumping out water, blasting soft/ hard rock or chiselling soft. Hard rock where blasting is prohibited all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring srtutting, planking, timbering and dewatering wherever required, stacking the usable and un-usable material/soil separately and after laying, jointing and testing of pipes returning the usable soil to trenches in 15cm (fifteen centimeters) layers including consolidating of such deposited layer by ramming and watering and then disposing of all of all surplus soil un-usable materials as directed within all leads and lifts including rstoration of un-matalled surfaces to its original condition and also i/c cost of diversion of traffic, night signals, fixing caution boards crossing over trenches for access to houses, etc. complete in respects with all leads and lifts as per directed of Engineer-in-charge of the site of work.( Pick Jumper Work)
Providing and laying cement concrete 1:6:12 mix (one cement :Six sand :twelve stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in Retaining wall as per direction of Engineer- in-Charge with in all lead & lifts.
Providing and laying cement concrete 1:4:8 mix (one cement :Four sand :Eight stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in Retaining wall as per direction of Engineer- in-Charge with in all lead & lifts.
Providing form work with steel plates 3.15milimetres thick welded with angle iron in frame 30x30x5mm So as give a fair finish including centring shuttering , strutting and propping etc. with wooden battans & ballies, height of propping & centring below supporting floor to celing not exceeding 4.00 metres & removal of the same for in situ reinforced concrete & plain concrete work in :-
Vertical surface such as wall (any thickness) partitions walls & the like including the attached pillaster,s buttresses plinth string courses & the like as per the direction of the engineer-in-charge with in all lead & lifts.
Providing & fixing galvanised mild steel barbed wire (IS: 278-1962 Type-I) weightng 9.38 Kgs per 100 metres (minimum) straining and fixing to any type of standard rails straining bolts including securing with and provision of galvanised mild steel wire stapples or steel pipe etc. complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge with in all leads and lifts.
Fixing of RCC Fencing Post
Steel work welded in built up sections, trusses and framed work including cutting,hoisting fixing in position and applying a priming coat of red lead paint in grating framed guard bars,ladders railing, brackets and similar work including all leads and lifts complete.
Hardeep Singh (BID ID -539215)
Akash Singh (BID ID -539162)
Ram Ji Dass (BID ID -539151)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid