Loading…
Loading…
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
28 Aug 2026, 5:00 pm2d left
Superintending Engineer PMGSY Circle Jammu
Office of the Superintending Engineer PMGSY Circle Jammu Tiger Division Burma Dwar, Satwari
Renewal Coat under Cities and Towns on road Km 5th of T04 to Thera Topa Part-II under Pkg No. JK11-121, Length 5.00 kms, including Initial Rehabilitation, Periodic Renewal, Emergency Works and 5-year Routine Maintenance after completion of Last Renew
2026_JKRRD_148841_1
SE/PMGSY/J/31 of 2026-27 dATED 29.07.2026
Open Tender
Civil Works - Roads
Percentage
730 days
Mendhar
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
₹3.4 L
PMGSY Circle Jammu
28 Aug 2026
29 Jul 2026
29 Aug 2026
30 Jul 2026
28 Aug 2026
2 Aug 2026
2 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 4.95 | Cum | 256.85 | ₹1,271.41 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.9 | Cum | 5,202.9 | ₹4,682.61 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 37.2 | Cum | 5,733.6 | ₹2,13,289.92 |
| 0.0 | Random Rubble masonry with hard stone in foundation and plinth
including leveling up with cement concrete Cement mortar 1:6 (1 Cement : 6 coarse sand) | 9 | Sqm | 5,402.9 | ₹48,626.1 |
| 0.0 | Providing and laying damp-proof Course/ coping 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 0.3 | Sqm | 416.5 | ₹124.95 |
| 0.0 | Back Filling behind R/wall Abutment Wing wall Retaining wall with available stone from earthwork completed as per drawing and techinical specification (50% Earth & 50% Stone) | 1.8 | Cum | 578.15 | ₹1,040.67 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 4 | Sqm | 286.35 | ₹1,145.4 |
| 0.0 | B) Centering and shuttering including strutting, propping etc. and removal of form work for: Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | 0.5 | Sqm | 628.95 | ₹314.48 |
| 0.0 | Carriage of Sand for an average distance of 30 km by MT | 18 | Cum | 520.34 | ₹9,366.12 |
| 0.0 | Carriage of Aggregate 40 mm normal size for an average distance of 30 km by MT | 0.8 | Cum | 565.64 | ₹452.51 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.36 MB
SBDMendhar31.pdf
Tender Documents • 2.20 MB
BOQ_234119.xls
BOQ • 0.57 MB
CorrigendumExtensionRenewalcoat.pdf
PDF • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].