Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC AT STATION ROAD JAMTARA JHARKHAND 815351 | JAMTARA | JHARKHAND | 815351 | ₹1.4 Cr | L1 | Accepted-AOC Qualified |
| 2 | L2₹1.4 Cr+₹30 (<0.01%)Rejected-Finance BHUPESH KUMAR GUPTA DEOGHAR | DEOGHAR | JHARKHAND | 814112 | ₹1.4 Cr+₹30 (<0.01%) | L2 | Rejected-Finance Disqualified |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
11 Sept 2024, 5:00 pmClosed
Executive Engineer
R.D.Spl. Div., Jamtara
Construction of Integrated Public Health Laboratory (IPHL) at Jamtara.
2024_RDSPL_92026_1
RDD/SD/JAMTARA/08/2024-25
Open Tender
Civil Works
Percentage
243 days
Jamtara
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.8 L
11 Jan 2025
3 Sept 2024
13 Sept 2024
4 Sept 2024
11 Sept 2024
4 Sept 2024
Amount
PUFF PENALING WORK Supply, installation, testing and commissioning of modular OT Wall and corner panels with insulated prefabricated puff Panels. The OT wall shall be constructed using GI puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of 80 mm thickness are firmly bonded together by sprayed -in insulating foam, which hardens during the process. The core consists of rigid polyurethane foam, which has been injected under high pressure, with a minimum density of 40kg/m3. The thickness of Puff shall be minimum 40 mm. The sheet panel shall be of indigenous reputed make and be provided with manufactures test certificate. The puff panel shall be fixed to the floor with bottom track of 1.5 mm thick steel U channel section having min size of 50mm X 50mm. The bottom shall be fixed in the floor of the OT with 10mm thicknessand min. 60 mmlong SS fasteners which shall be fully threaded and power drilled The Panels of walls and ceilingshall be tied together by suitable SS coving. The individual wall panels of wall and ceiling shall be tied together by suitable SS coving. The individual wall panels shall be welded together bySS. All joints shall be filled with metal filler and shall be sand casted on site till smooth finish is obtained. Wall & panel joints shall not be visible after the final wall coating is applied. The gap between the masonry wall surfaces and the panel of the theatre shall be sufficient for the flush mounting of equipment’s. This gap shall be provided to accommodate the equipment at a latter date and to enable services, pipes conduits etc, to be run within the gap All wall-mounted equipment shall be flush mounted and sealed in operation theatre. All the sharp edges and corners shall be in radius to avoid bacterialcontamination. The wall panel design shall be such that it enables the installation and supports all equipment’s. Provision of openings required for the installations shall not affect rigidity and strength of the panel. Access boxes shall be fitted to the rear of all wall-mounted equipment to enable maintenance to be carried out from outside the operation theatre. Product should have warranty of at least 10 years. Thework should be executed as per the directions of Engineer–in-Charge.
Supply, installation, testing and commissioning of modular OT Wall and corner panels with insulated prefabricated puff Panels. The OT wall shall be constructed using GI puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of The individual wall panels shall be welded together bySS. All joints shall be filled with metal filler and shall be sand casted on site till smooth finish is obtained. Wall & panel joints shall not be visible after the final wall coating is applied. The gap between the masonry wall surfaces and the panel of the theatre shall be sufficient for the flush mounting of equipment’s. This gap shall be provided to accommodate the equipment at a latter date and to enable services, pipes conduits etc, to be run within the gap. All wall-mounted equipment shall be flush mounted and sealed in operation theatre All the sharp edges and corners shall be in radius to avoid bacterial contamination. The wall panel design shall be such that it enables the installation and supports all equipment’s. Provision of openings required for the installations shall not affect rigidity and strength of the panel. Access boxes shall be fitted to the rear of all wall mounted equipment to enable maintenance to be carried out from outside the operation theatre. Product should have warranty of at least 10 years. The work should be executed as per thedirections of Engineer–in-Charge.
Supply, installation, testing and commissioning of modular OT ceiling panels with insulated prefabricated puff Panels. The OT ceiling shall be constructed using GI puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of 0.80 mm thickness are firmly bonded together by sprayed -in insulating foam, which hardens during the process. The core consists of rigid polyurethane foam, which has been injected under high pressure, with a minimum density of 40kg/m3. The thickness of Puff shall be minimum 40 mm. The sheet panel shall be ofindigenous reputed make and be provided with manufactures test certificate. The puff panel shall be fixed to the floor with bottom track of 1.5 mm thick steel U channel section having min size of 50mm X 50mm. The bottom shall be fixed in the floor of the OT with 10mm thicknessand min. 60 mm long SS fasteners which shall be fully threaded and power drilled. The Panels of walls and ceiling shall be tied together by suitable SS coving. The individual panels of wall and ceiling shall be tied together by suitable SS coving. The individual wall panels shall be welded together bySS. All joints shall be filled with metal filler and shall be sand casted on site till smooth finish is obtained. Wall & panel joints shall not be visible after the final wall coating is applied. The gap between the masonry wall surfaces and the panel of the theatre shall be sufficient for the flush mounting of equipment’s. This gap shall be provided to accommodate the equipment at a latter date and to enable services, pipes conduits etc, to be run within the gap. All wall-mounted equipment shall be flush mounted and sealed in operation theatre All the sharp edges and corners shall be in radius to avoid bacterial contamination. The wall panel design shall be such that it enables the installation and supports all equipment’s. Provision of openings required for the installations shall not affect rigidity and strength of the panel. Access boxes shall be fitted to the rear of all wall mounted equipment to enable maintenance to be carried out from outside the operation theatre. Product should have warranty of at least 10 years. The work should be executed as per thedirections of Engineer–in-Charge.
EPOXY WORK Providing Epoxy flooring self leveling type on strong base in desired colour/design as approved by Engineer-in-Charge. Resin for epoxy is to be of floor grade type i/c appropriate hardner and filler material. with 5 year defect liability period.3 mm thick
MISCELLANEOUS WORK DOOR WORK Hermetically Sealed Sliding Door System: Fabrication, Supply, installation, testing & commissioning of sliding type Hermetically Sealed door having high density particle board cores/ CFC free Polyurethane, high pressure laminate face on both sides, viewing window 300 x 300mm. Size: 1500 x 2100 mm (W x H) as per direction of EIC. Automatic Doors: Provided with Radar Switch - 2 Nos., Foot Switch - 2 Nos. and Photocell Sensors. Automatic Door (1500 mm x 2100 mm) Approved makes - Metaflex /REBBON / MDD Engineering/ Altos / Dormed/ Meditech
HOSPITAL FURNITURE WORK Revolving Chair With Arm Synchronic tilt mechanism (GODREJ INTERIO ACE FULL BACK CHAIR) (Product id: 5116877-95084053146)
OCEAN LIFE SCIENCE CORPORATION Laboratory Steel Furniture Side bench with rack and table top OCEAN LIFE SCIENCE CORPORATIONR (OLSC-IWB)
BETCO Laboratory Steel Furniture Island bench with table top BETCOR (BETCO-LB-202)
Tanks Supply, installation. Testing and commissioning of following Tanks In MSEP/HDPE Flash Mixer Flocculation tank Settling Tank Break Tank SBR Tank
for Supply Fan , 4850 CFM Ex. Blower , 75 mm Static Pressure 4300 CFM Supply Blower, 6 Row CC, 125 mm Static , Pressure for Exhaust fan ) Supply Installation, testing & commissioning of Air Cooled Ductable Split Units. - Outdoor & Indoor unit shall connected with DX coil, refrigerant piping, firstcharge of refrigerant & oil, HP/LP cutout, thermostatic expansion valve, distributor, starter and other necessary controls to form a factory tested compact unit. The outdoor unit shall have condenser coil, fans with motor & drive, copleand scroll compressors, panel etc. The ductable units should be complete with programable microprocessor panel (BMS Compatible). ( Make: LG / Blue Star / Daikin) 8.5 TR With Scroll Compessor
FFU - 780 CFM with Hepa Filter, 40 MM of WC
FFU - 1300 CFM with Hepa Filter, 40 MM of WC
Supply,installation and testing of powder coated aluminium extruded grills/diffusers as per specifications given in tender and of following sizes: Single Louvered supply / Return Air registers (Grill)
Supply / return suare ceiling air terminals (diffusers)
Fresh / Exhaust air louvers with bird screen & damper
Flexible connection for AHU/FCU madeup of f/r fabric compelte with flange
Supply,installation and testing of multiblade type GI Duct Damper for duct/collars to be provided with suitable links and quadrants for control of volume of air
Supply and Application of Acoustic Insulation Inside the Duct with Engineered Nitrile Rubber open cell foam with Density 140 - 180 Kg/m3 passing Class 1 Fire Performance test as per BS 476 Part 7, Air Erosion test for 10,000 fpm air velocity as per ASTM C 1071-05 and with built-in antimicrobial protection. The material should pass Fungi Resistance Test as per DIN EN ISO 846 Method A and Bacterial Resistance Test as per DIN EN ISO 846 Method C; to be applied using manufacturer's recommended Rubber based Adhesive in a blend of solvents.conforming to standard specification. 15 mm thick open cell nitrile rubber.
Supply & Installation of Thermal Insulation on Ducts not exposed to sunlight using Closed Cell Class O Nitrile Rubber Elastomeric Insulation of Density 40 - 60 Kg/m3, Thermal Conductivity of 0.037 W/mk at 20 Celcius Mean Temp. and µ≥7000 (without any additional vapour barrier) and with factory laminated aluminium foil of minimum 60 Microns thickness having weight of 193 gsm as per EN ISO 2286-2, tensile strength shall be 90N/15mm as per EN ISO 527-3 with elongation > 10% as per EN ISO 527-3; to be applied on Ducts using manufacturer's recommended Rubber based Adhesive in a blend of Solvents.25 mm thick (Class O) Foil for Supply Air Duct
MOTOR CONTROL CENTRE
ii) For Indoor Unit Blower & Compressor 3C x 4 Sq. mm Aluminium Conductor
iii) For Condenser Fan 2C x 1.5 Sq. mm Copper Conductor
Control Cabling ( PVC insulated & PVC sheathed, armoured, Copper Conductor of 1.1 KV grade of following sizes. 6C x 1.5 Sq. mm Copper Conductor
Supply & laying of 8 SWG GI wire.
Labour cess @ 1%
Bidder Name
Amount
BHUPESH KUMAR GUPTA (GSTN-20AKXPG2885L1ZN) BID ID -623699
shree ganesh construction (GSTN-20APMPP9811M1ZH) BID ID -623717
BHUPESH KUMAR GUPTA
BHUPESH KUMAR GUPTA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .