Loading…
Loading…
Tender Value
₹52.6 L
EMD Value
₹1.1 L
Closing Date
10 Jun 2026, 5:00 pm4d left
Executive Engineer
Executive Engineer
Balance work of C O New Bus Stand at Bhoranj SH C O Rain Harvesting Tank Parking Ground Deposit Work
2026_PWD_135675_1
2729-69 dt 02-06-2026
Open Tender
Civil Works - Others
60 days
Bhoranj
Please refer Tender documents.
12 documents required · 12 mandatory
₹4,000
₹1.1 L
5 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation for structure as per drawing and technical specification clause 305.1 including setting out construction of shorting and bracing removal of stumps and other deleterious material and disposal upto all lead . dressing of sides and bottom and back filling interior with excavated suitable material (i) ordinary soil upto 3 mtr. depth including entire carriage of materials in all leads and lifts. including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. | 312.77 | Per cubic meter | 300 | ₹93,831 | 1 |
| 2 | Loosening of the ground upto a level of 300 mm (three hundred millimeter) below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 (three hundred point one) and 300.2 (three hundred point two) for subgrade construction as per Technical Specification Clause 303.5.2(three hundred three point five point two). Both side shoulder. Including all leads, lifts and carriage of materials complete as per entire satisfaction of the Engineer in charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 396.8 | Per cubic meter | 38.95 | ₹15,455.36 | 2 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level: 1:4:8 (one Cement : four Coarse Sand) eight Graded Stone aggregate 40 mm nominal size) including entire carriage of materials in all leads and lifts. including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. | 1.86 | Per cubic meter | 4,800 | ₹8,928 | 3 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (one cement : one & half coarse sand) : three graded stone aggregate 20 mm nominal size) including entire carriage of materials in all leads and lifts. including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. | 5.72 | Per cubic meter | 7,000 | ₹40,040 | 4 |
| 5Centering and shuttering including strutting, propping etc. and removal of form for including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. | ||||||
| 5.01 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc | 73.45 | Per Square Meter | 450 | ₹33,052.5 | 6 |
| 5.02 | Suspended floors, roofs, landings, balconies and access platform | 7.07 | Per Square Meter | 490 | ₹3,464.3 | 7 |
| 6 | Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site. including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. | 1 | Per cubic meter | 1,250 | ₹1,250 | 8 |
| 7 | Providing & laying of granular Sub-base by providing close graded material confirming to specification mixing in a mix plant at OMC carriage of mixed material by tipper to work sites for all leads and lift.Spreading in uniform layers of specified thickners with material confirming to grade-1 and as per direction of Engineer-in-Charge.including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Governme | 198.39 | Per cubic meter | 2,150 | ₹4,26,538.5 | 9 |
| 8 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering- All work up to plinth level:1:3:6 (1 Cement : 3 Coarse Sand) 6 Graded Stone aggregate 40 mm nominal size)including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. | 17.25 | Per cubic meter | 5,400 | ₹93,150 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
SBD1.pdf
Tender Documents • 5.05 MB
BOQ_200895.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid