Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹2.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.1 LRejected-Finance STATION ROAD P O UKHRA DIST BURDWAN PIN 713363 W B | UKHRA | BURDWAN | WEST BENGAL | 713363 | ₹3.1 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical STATION ROAD UKHRA BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | ANNAPURNA ENTERPRISE L2 | M S ELECTRICALS L1 |
|---|---|---|---|---|---|
| 1.00(A) 65KW Mine Line make Gate End Box . (Inclusive of EPF/CMPF) | |||||
| 1.01 | Supply of new Isolator | 1 | Nos | 8,200 ₹8,200 | 7,700 ₹7,700 |
| 1.02 | Supply of isolator jumper | 3 | Nos | 1,250 ₹3,750 | 1,200 ₹3,600 |
| 1.03 | Supply of stud with Insulator | 9 | Nos | 725 ₹6,525 | 700 ₹6,300 |
| 1.04 | Supply of Earth Leakage Relay | 1 | Nos | 8,500 ₹8,500 | 8,200 ₹8,200 |
| 1.05 | Supply of overload Assembly | 1 | Nos | 6,800 ₹6,800 | 6,750 ₹6,750 |
| 1.06 | Supply of main connection flexible copper lead. | 4 | Mtrs | 1,250 ₹5,000 | 1,200 ₹4,800 |
| 1.07 | Supply of copper socket | 8 | Nos | 90 ₹720 | 100 ₹800 |
| 1.08 | Supply of HRC fuse with carrier | 2 | Nos | 250 ₹500 | 300 ₹600 |
| 1.09 | Supply of CBT with board | 1 | Nos | 2,050 ₹2,050 | 1,800 ₹1,800 |
Tender Value
₹2.9 L
EMD Value
₹3,700
Closing Date
17 Mar 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
REPAIRING and OVERHAULING OF (A) 65KW MINE LINE MAKE GATE END BOX AT 69NO. LEVEL plus 1NO. DIP SDL and (B) 100HP PRABHU MAKE STAR DELTA STARTER AT PIT NO.2 COUPLED WITH MAIN PUMP AT SOUTH SAMLA UNIT OF MSAM COLLIERY
2026_ECL_355908_1
GM-PND/EandM/25-26/326/1763 dated 06/03/2026
Open Tender
Electrical and Maintenance Works
30 days
MSAM Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,700
13 May 2026
7 Mar 2026
18 Mar 2026
7 Mar 2026
17 Mar 2026
7 Mar 2026
7 Mar 2026 - 10 Mar 2026
(A) 65KW Mine Line make Gate End Box . (Inclusive of EPF/CMPF)
Supply of new Isolator
Supply of isolator jumper
Supply of stud with Insulator
Supply of Earth Leakage Relay
Supply of overload Assembly
Supply of main connection flexible copper lead.
Supply of copper socket
Supply of HRC fuse with carrier
Supply of CBT with board
Supply of C.T.
Supply of Lamp with holder
Supply of Body bolt, brass washer, nut, connection bolt etc.
Wiring wire
Contactor Unit ML-10
Supply of P.T. 550V/440V/12V/ 24V/110V
Supply of Ampsmeter
Supply of Push switch
Repairing charges
Overhead 10%
Transporting charges both side loading & unloading
(B) 100HP Prabhu make Star Delta Starter . (Inclusive of EPF/CMPF)
Supply of new Isolator new with busbar
Supply of Main terminal insulator
Supply of overload assembly
Supply of Earth Leakage Relay
Supply of Timer
Supply of C.B.T.
Supply of C.T.
Supply of main connection cable
Supply of copper socket
Supply of Ampsmeter
Supply of push switch
Supply of Lamp with holder
Supply of fuse base carrier
Wire for wiring 2.5mm
Contactor unit ML-10
Contactor Unit ML-6
Profit & overhead cost @ 10%
Repairing cost
Transporting charges up/down
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_368760.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid