Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.6 LAccepted-AOC 00 BUDDH VIHAR MANSAROVER DELHI ROAD NEAR SAI KANYA INTER COLLEGE MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | L1 | Accepted-AOC Highest turnover | |
| 2 | L1₹80.6 LRejected-AOC | L1 | Rejected-AOC 2 nd Highest turnover | |
| 3 | reject₹80.6 LRejected-Finance | reject | Rejected-Finance not quoted for item no. 2 |
| Sl No | Description | Qty | Unit | NIKKEE ENTERPRISES L2 | AARTI ENTERPRISES L2 | KRISHNA ENGINEERING CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|
| 1.00Job-1 | ||||||
| 1.01 | Work contract for collection, preparation &transportation of various coal samples of PH- I and PH-II from CHP coal yard, reject coal yard, feeders, Mill etc along with auto coal sampler from Transfer Points & PCH’s etcin plant premises at SSTPP, Dongalia and Size analysis of washed coal including consumables for preparation of coal samples as per scope of work.
(Period of Work - 12 Months) | 5,41,963.2 | Months | 27,098.16 ₹80,57,908.8 Lowest | 27,098.16 ₹80,57,908.8 Lowest | 27,098.16 ₹80,57,908.8 Lowest |
| 2.00Job-2 | ||||||
| 2.01 | Transportation of samples from site to lab and dumping of reject coal from lab to coal yard etc within the plying limit of 1000 Km per month as per scope of work. | 12 | Months | 0.12 ₹0.12 Lowest | 0.12 ₹0.12 Lowest | - |
Tender Value
₹85.2 L
EMD Value
₹1.7 L
Closing Date
30 Aug 2022, 3:30 pmClosed
S.E. (Works), SSTPP
S.E. (Works), SSTPP
Annual work contract for providing assistance in collection, preparation and transportation of various coal samples of PH-I and PH-II at SSTPP, MPPGCL, Dongalia, Khandwa for a period of 12 months
2022_MPPGC_200985_1
WT-1682
Open Tender
Miscellaneous Works
Item Rate
365 days
SSTPP MPPGCL Dongalia
As per NIT
18 documents required · 18 mandatory
₹2,000
Yes
₹1.7 L
Yes
8 Oct 2025
18 Jul 2022
31 Aug 2022
18 Jul 2022
30 Aug 2022
18 Jul 2022
Work contract for collection, preparation &transportation of various coal samples of PH- I and PH-II from CHP coal yard, reject coal yard, feeders, Mill etc along with auto coal sampler from Transfer Points & PCH’s etcin plant premises at SSTPP, Dongalia and Size analysis of washed coal including consumables for preparation of coal samples as per scope of work. (Period of Work - 12 Months)
Transportation of samples from site to lab and dumping of reject coal from lab to coal yard etc within the plying limit of 1000 Km per month as per scope of work.
NIKKEE ENTERPRISES
AARTI ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .