Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
29 Sept 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE NARANGI
GE Narangi C/O 99 APO Narangi,Guwahati
Job Work
2020_MES_376661_1
3010/A/08/E3
Limited
Job Works
Works
45 days
GE NARANGI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
1 Oct 2020
12 Sept 2020
1 Oct 2020
12 Sept 2020
29 Sept 2020
13 Sept 2020
45 days
Amount
SCHEDULE 'A' PART-I
STRUCTURAL CONSULTANCY Consultancy for preparation of str design and drgs for provn of weigh bridge at 313 ASC Supply as per Architectural drgs attd. Notes: (a) The following structural details shall be adopted for design:- (i) RCC - M-30 (Design Mix) as per IS codes. (ii) Reinforcement - Fe-500 D (TMT Bars) (iii) Sesmic Design – Zone V (iv) SBC of soil – SSI Report shall be given by the client (v) Wind Speed – 50m/sec (vi) Temp range – (+) 2 degree to (+) 50 degree Celsius (vii) Roof Slope – as shown on roof plan / as specified. (b) Design Standards: The consultant is expected to carry out design with due diligence and in accordance with laid down standards, regulations and sound engineering practices. The consultant is also expected to undertake midterm review of design to meet site requirement during execution phase of the project. Provisions & specifications contained in different IS codes are expected to be followed while designing. The main codes are as follows (In addition all other relevant codes may be followed):- • IS:875-1987: Code of Practice for Design loads • IS:800-2007: Design of structural using steel • IS:456-2000:Code of practice for Plain and Reinforced concrete. • IS:1893-2016:Criteria for E/Q Resistant Design for Structures including for water retaining structures. • IS:4326:2013:E/Q Resistant Design & Construction of Buildings. • IS:13920-2016:Ductile Detailing of Reinforced Concrete Structures. • SP:16:Design aids to IS 456:2000 • SP:34:Concrete Reinforcement & Detailing
Architectural and Structural Consultancy :- Consultancy for preparation of Architectural, structural design and drgs for provn of office bldg of size 5.50mtr×4.00mtr×3.2mtr for weigh bridge (Group-IV bldg) Floor area (5.50mtr×4.00mtr)=22.00 sqm PAC factor 85% = 18.70 sqm Total plinth area = 40.70 sqm Specification Notes :- Specification is based as Group-IV Ref to E-in Cs letter No A/83975/PA/OTM Accn/E2W (PPC) dated 04 Dec 2012. • Seismic Zone V (Single Storey) • RCC framed construction • Burnt Bricks MCM 1:6 • PCC for foundation 1:5:10 • RCC M:25 design Mix • DPC:PCC 1:2:4 with water proofing compound • RCC sloped Roof in RCC M:25 design Mix • Water proofing treatment is Roof in APP membrane • Plastering on walls: Internal :15mm thick in CM 1:6 External 15mm thick in CM 1:4 • Flooring : Ceramic tile flooring over 15mm thick screed bed in CM 1:4 over a layer of PCC 1:2:4 over sub-base of PCC 1:5:10 • Dado/skirting : Ceramic tile over 10mm thick cement screed in CM 1:3 • Joinery (windows) : Steel windows with or without sash bars with sheet glass glazing. • Steel Grills/Gurard bars : M.S. Grills/Gurad bars to window. • Iron monger : M.S/Aluminium anodized fittings as applicable • Finishes : External : Cement Based Paints Internal : OBD • Plinth Protection : 75mm thick PCC 1:3:6 over stone Hardcore. • Electric wiring: Concealed conduit electric copper wiring pre conducting with CFL/FTL fitting ,• Water Supply :- GI medium (Area Pipes with PVC OH tanks, as applicable),• Sanitary fittings : Vitreous china approved make (white) including plumbing. • ATT:- Anti-termite treatment,• Foundation : Excavation on Soft/loose soil.
Surveys & Soil Investgation: (1) Mobilization / Transportation erection and dismantling of all required equipment at proposed site including deployment of shifted and suitable personal for effective soil investigation as directed. (2) Carrying out soil investigation as per relevant IS Codes complete all as specified and directed including the following. (a) Boring 150mm dia hole at various locations at shown at site by Engr-in-Charge in any kind of soil by excluding rock, collection of undistubed sample at every 1.00 mtr depth. Collection of disturbed sample at suitable depth as required at site. Conducting standard penetration test as per relevant IS at an interval of 1.50mtr as under. (i) Office Building in (1 Nos x 10 RM) = 10 RM (ii) Weigh Bridge in (2 Nos x 10 RM) = 20 RM ________ 30 RM (3) Carrying out following laboratory tests on the soil samples as per IS codes:- (a) (i) Sieve analysis and hydrometer tests for identification and classification of soil based on properties and grain size. (ii) Specific gravity of soil. (iii) Studies of settlement characteristics of soil based on consolidation tests and liquid and plastic limit. (iv) Stratification of soil for entire depth pf bore log including ground water table locations and other properties. Evaluation of shear parameters of undisturbed soil samples by adopting direct shear test. (v) Nature moisture content (NMC), void ratio and porosity, Tria -Axial and direct shear test and unconfined compression test of undisturbed samples and Bluck, submerged and Dry Density of the soil. (b) Plate load test at appropriate depth to evaluate modulus of sub grade reaction as per relevant IS specification complete all as specified and as directed by Engr-in-Charge. (c) Compilition of SSI Report as per IS Vix, Field and Laboratory test result, preparation of reports, Recommendation for different type of foundation water table with clear unambiguous recommendations for types of foundation for all structures with bearing capacity / pile capacities. Submission of all report booklets 05 (Five copies with CD 01 (One) copy duly indicating the following :- (i) Evaluation of safe bearing capacity of soil with respect to shear failure test and permissible settlement (Total and differential) alongwith recommendation about type of foundation and minimum depth of foundation tobe adopted. (ii) Specific suggestion if any for soil treatment if required below foundation / ground floor / roads and type of treatment to be carried out. (iii) Bore log diagram duly showing the different layers of strata met alongwith their depths.
stage.html
html • 0.02 MB
finance_420277.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .