| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | -31.00% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.8 LAdmitted-Finance | -5.00% | ₹6.8 L | L2 | Admitted-Finance |
| 3 | L3₹8.2 LAdmitted-Finance 702 SUNTECK GRANDEUR OPP ANDHERI SUBWAY ANDHERI MUMBAI MAHARASHTRA 400058 UDYAM MH 33 0073249 | MUMBAI SUBURBAN | MAHARASHTRA | 400058 | +14.00% | ₹8.2 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical 2 3 AMIT VIJAY APT CHSL KASTURBA CROSS ROAD NEAR BHANU PARK KANDIVALI WEST MUMBAI 400 067 | MUMBAI | MUMBAI | MAHARASHTRA | 400067 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical 3 NEW TRIMURTY CO OP HOUSING SOCIETY INGOLE NAGAR WARDHA ROAD NAGPUR 440005 MAHARASTRA | NAGPUR | NAGPUR | MAHARASHTRA | 440005 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.2 L
EMD Value
₹14,302
Closing Date
30 Mar 2026, 4:00 pmClosed
Executive Engineer (Edu.Wing)
Room No 1608, Palika Kendra , Sansad Marg, New Delhi-110001
Proposal for complete building consultancy services / Health assessment / Structure Audit of the existing building, NDMC, Atal Adarsh Vidyalaya, Dr. APJ Abdul Kalam Lane under Education Wing(South)
2026_NDMC_288995_1
16/EE (Education wing)/2025-26.
Open Tender
Civil Works
60 days
NDMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,302
16 Apr 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Consultancy services / Health assessment / Structure Audit as details below : Scope of work :- i. Documentation of detailed information of existing structure (Atal Adarsh Vidyalaya, Dr. APJ Abdul Kalam Lane). ii. As built drawings and framing plan required for modeling and STAAD analysis iii. Visual inspection of the site iv. NDT -Non-Destructive Tests (as required as per as built drawings and visual inspection) NDT Test details: a). Rebound Hammer Test b). UPV Test c). Rebar Scanning Test d). Half Cell Potential Test e). Carbonation test V. The residual life of the building should be mentioned in the final report. Vi. The agency will suggest Nature and type of repairs/rectifications work suggested along with methodology, sequence and extent of repairs/ retrofitting. Vii. The agency will submit detail suggestion / measure to be carried out for the repair / rectification/ retrofitting work to be executed to increase the life span of the structures in approximately number of years. Viii. Documentation and compilation of NDT data in required formats ix. SAD -Software Analysis & Design of existing building i.e. Atal Adarsh Vidyalaya, Dr. APJ Abdul Kalam Lane x. Result comparison of existing building data with the SAD details xi. Structure Audit Report. xii. Preparation of BOQ | |||||
| 2Special Condition:- 1. Atal Adarsh Vidyalaya, Dr. APJ Abdul Kalam Lane constructed in the year 1968. 2. Block-1 = G+2 (Ground floor + 2 Floors) . 3. Block-2 = G-1 (Ground floor + 1 Floors) 4. Total Area= (Block-1)+(Block-2)= 2876.01 Sqm. (Approx) The defects of the buildings as per visual inspection are as under:- (a) Damaged structure members like slab/ chhajjas/ corridor. (b) The cover of slabs is falling and steel bar of the slab are in deteriorated condition. (c) Extra steel members have been given for support of the structure/chhajja. (d) Tilted chhajja / corridor of toe wall in first and second floor of the building and looking very weak. (e) Some seepage has been observed in the building due to which plaster / C.C. are peeling off. (f) A lot of repairing work have been done till date. • The report shall be concluded with final suggestion / conclusion mentioning the best option for the building keeping in view the economical aspects. . The final report shall be vetted by IIT/NIT The structural consultant will issue a completion certificate as under- Completion certificate: - It is certified that the work has been successfully completed as per the BOQ and work has been executed under the supervision of Structural Engineer. MODE OF PAYMENT :- Payment will be made as per the conditions laid down in NIT / agreement. | |||||
stage.html
html • 0.04 MB
techsummary_383606.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_383606.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid