Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.3 LAWARDED | AWARDED |
Tender Value
₹7.4 L
EMD Value
₹7,837
Closing Date
21 Aug 2025, 9:30 pmClosed
Directorate of Municipal Administration
Construction of CD near Aravalad Thota & Anjaneyanagarinfront of Basavanakar house & Rajajinagar at w.no. 26
DMA/2025-26/OW/WORK_INDENT42695/CALL-2
DMA/2025-26/OW/WORK_INDENT42695/CALL-2
Reserved
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
₹500
₹7,837
2 Aug 2025
2 Aug 2025
16 Aug 2025
Construction of CD near Aravalad Thota & Anjaneyanagarinfront of Basavanakar house & Rajajinagar at w.no. 26
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Loading and Unloading of Stone Boulder/Stone aggregates/ Sand/Kankar/Moorum. (Tipper 5.5 m3) SR 2023-24 P.No.3/1.1a(Volume-3)
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. Th...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete Drain Walls 35% Percentage on finished rate of concrete per m3 (SL No-4)SR 2023-24 P.No.111(Volume-1)
Addendum I Additionalities for Formwork, Centering & Scaffolding for Solid Slab Super Structure 20% Percentage on finished rate of concrete per m3 (SL No-1)SR 2023-24 P.No.112(Volume-1)
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .