Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 CrAccepted-AOC | ₹12.8 Cr | L1 | Accepted-AOC WROK ALLOTED |
| 2 | L2₹13.8 Cr+₹97.5 L (7.59%)Rejected-Finance AT GIRISH TAKIES KALYANPUR DIST JAMUI PIN 811307 | JAMUI | BIHAR | 811307 | ₹13.8 Cr+₹97.5 L (7.59%) | L2 | Rejected-Finance Non Responsive |
Tender Value
₹14.4 Cr
EMD Value
₹29.1 L
Closing Date
28 Aug 2024, 5:00 pmClosed
E.E RWD WORKS DIVSION SAHIBGANJ
E.E RWD WORKS DIVSION SAHIBGANJ, VIKASH BHAVAN
PKG NO -RWD/SAHEBGANJ/STPKG/12/24-25Special Repair of Road from (i) Gadra to Gargama via Ranidih (L-2.980 Km.), (ii) Motipahari Syphon to Simawori via Kadauna Poraiya (L-4.050 Km.),
2024_RWD_89351_1
RWD/SAHEBGANJ/STPKG/12/ 2024-25
Open Tender
Civil Works
Percentage
450 days
SAHIBGANJ
TENDER FEE,EMD,AFFIDAVIT
4 documents required · 4 mandatory
₹10,000
₹29.1 L
9 Sept 2026
8 Aug 2024
30 Aug 2024
8 Aug 2024
28 Aug 2024
8 Aug 2024
8 Aug 2024 - 28 Aug 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (i) Gadra to Gargama via Ranidih (L-2.980 Km.)
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 | 0.76 | Ha | 19,760.3 | ₹15,017.83 |
| - | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.
By Mechanaical Means using Hydraulic excavator. | 1,815.98 | M2 | 4.8 | ₹8,716.7 |
| - | Dismantling of Cement Concrete Pavements (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately) | 32.77 | M3 | 442.6 | ₹14,504 |
| - | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) (By Mechanichal Means)
Cement Concrete Grade M-15 & M-20 | 6.3 | M3 | 652.8 | ₹4,112.64 |
| - | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) (By Mechanichal Means)
Prestressed/ Reinforced cement concrete grade M-20 & above (Deck Slab) | 13.5 | M3 | 887 | ₹11,974.5 |
| - | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) (By Mechanichal Means)
Dismantling Rubble stone masonry in cement mortar | 33.75 | M3 | 286.3 | ₹9,662.63 |
| - | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 2,361.59 | M3 | 131.3 | ₹3,10,076.77 |
| - | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)
Including Royalty etc@ Rs. 27.48 per cum but excluding the cost of watering, rolling & compaction. | 390.84 | M3 | 62.4 | ₹24,388.42 |
| - | Granular Sub-Base with Coarse Graded Material (Table:- 400- 1)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
With Grading-I Material | 164.92 | M3 | 2,603.35 | ₹4,29,344.48 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 477.01 | M3 | 2,924.55 | ₹13,95,039.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
DOUBLEF2BIDDOCUMENT.pdf
Tender Documents • 1.24 MB
BOQ_120633.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .