Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.2 LAccepted-AOC | L1 | Accepted-AOC Quoted Lowest rate and
Executed Agreement on 22.12.2022 after negotiation | |
| 2 | L2₹1.0 Cr+₹3.1 L (3.15%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
28 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev)/Project Director, DRDA
O/O AC (D) / PD DRDA Thoothukudi
Thoothukudi Dt AGAMTII 21-22 Pkg NoTN/TUT-07/22-23 Rejuvenation of Water Bodies - In KeelaVallanadu, Aligudi, Seidunganallur, Serakulam, Vittilapuram Kovilpathu, Vallakulam and Thathankulam Village Panchayat in Karungulam Block
2022_RDTN_237656_39
AC(D)/PD,DRDA,Tuty,Lr.No A3/2573/2022 dt.20.06.202
Open Tender
Civil Works
Item Rate
180 days
Thoothukudi District
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹1.0 L
O/O AC (D) / PD DRDA Thoothukudi
10 Jan 2023
8 Jul 2022
28 Jul 2022
8 Jul 2022
28 Jul 2022
8 Jul 2022
8 Jul 2022
Amount
Rejuvenation of Pannaiyoothukulamoorani (Desilting, Construction of Inlet and outlet wire) in Muruganpuram in Karungulam Panchayat Union of Thoothukudi District under AGAMT –II 2021-22. Package No TN/TUT-07/2022-23
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Surplus weir Inlet
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation. As per SS20B
Plain Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith including handling charges for the same at the both ends cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.
Cement concrete1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Plain Cement concrete 1:2::4 mix using 20mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith including handling charges for the same at the both ends cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.
Surplus weir Outlet
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation. As per SS20B
Plain Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith including handling charges for the same at the both ends cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.
Cement concrete1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Plain Cement concrete 1:2::4 mix using 20mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith including handling charges for the same at the both ends cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.
Construction of Retain Wall @Main Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Rejuvenation of mayandikovil oorani(Deepening of baby pond, lining wall, bathing Ghat) in Aligudi Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Lead Channel
Construction of Lining Wall @Baby Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Formation of Pillaiyarkovil new Oorani ( Baby pond, lining wall, Bathing Ghat) in Ayyanarkulampatti
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Lead Channel
Construction of Lining Wall @Baby Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing ghat
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Formation of new oorani in Poramboku land in serakulam
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Lead Channel
Construction of Lining Wall @Baby Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing ghat
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Retaining Wall @Main Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Rejuvenation of Udayankulam oorani in V.Kovilpathu Deepening of baby pond, lining wall, bathing Ghat)
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Lead Channel
Construction of Lining Wall @Baby Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing ghat
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Rejuvenation of Sivankovil Oorani (Desilting , Lighting, Sitting Bench Arrangement ) in V.Kovilpathu
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Lead Channel
Construction of Bathing ghat
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Retaining Wall @Main Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Sitting arrangement
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Pre Cast Slab using Reinforced Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. - 50mm thick - for Sitting bench -(1.8 x 0.45 x 0.05m) including cost of steel etc. complete
cost of granite tiles - (Sperfine polished with machine cut edges ) of size 2'0" x 1'0" or 1'0" x1'0" or 1'0" x 0'6", of 10mm thick - Ruby red, Raw silk etc.
Providing Paver Block arrangement
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Centering charges for PCC works including all cost and conveyance all materials to site etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Collection and supply of10-12mm metal from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted over a thin bedding sand layer of 25 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504.
Street light Arrangements
6mtr length Double Bracket pole with Base plate (250x250x6mm) 76.10mmOD x3.65mmThickx6000mm length
Formation of Oorani (Deepening, baby pond, Bathing Ghat and lining wall) in Vallakulam Poromboku land in Vallakulam Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Lead Channel
Construction of Bathing ghate
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Lining Wall @Baby Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Retaining Wall @Main Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Formation of Oorani Baby pond, Bathing Ghat and lining wall in Thathankualm Poraboku land
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Lead Channel
Construction of Lining Wall @Baby Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing ghat
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Retaining Wall @Main Pond
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VIDHYASAGAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .