Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 230 2 BAJANAI KOVIL STREET S KATTERI VILLAGE VANDAVASI TALUK TIRUVANNAMALAI DIST 604 406 | VANDAVASI | TIRUVANNAMALAI | TAMIL NADU | 604406 | Admitted-Finance |
| 2 | Admitted-Finance NO 33 BAJANAI KOVIL STREET PERANAMPAKKAM SEMMIYAMANGALAM CHETPET TALUK TIRUVANNAMALAI DISTRICT 606 904 | SEMMIYAMANGALAM | TIRUVANNAMALAI | TAMIL NADU | 606904 | Admitted-Finance |
Tender Value
₹39.1 L
EMD Value
₹40,000
Closing Date
10 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Tiruvannamalai District Providing Infrastructure Development works to AGAMT 2021-22 Village Panchayats at Nadukuppam Panchayat of THELLAR Block in Package No. TVM/2021-22/209
2022_RDTN_239407_1
Roc.No.1250/2022/A13 Dt.22.06.2022 209
Open Tender
Civil Works
Lump-sum
180 days
Thellar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹40,000
24 Aug 2022
5 Jul 2022
10 Aug 2022
5 Jul 2022
10 Aug 2022
5 Jul 2022
45 days
Amount
Part I : Rejuvenation of Kalarkollai Kulam in Nadukuppam Panchayat (Desilting of Pond, Baby Pond lining wall, Inlet Outlet & Bathing Ghat) at Thellar Panchayat Union
Desilting :Clearing scrub jungles including all other incidential charges etc., complete
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Construction of Bhathing Ghat :Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Baby Pond Lining wall :Filling with good river sand including cost and conveyance of all materials and all labours chages etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Inlet & Outlet : Earthwork excavation in all classes of soil as per SS 20A
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement Concrete 1:4:8 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Part II : Providing Pavaer Block in New ADC Main Street (54M) at Nadukuppam panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering and shuttering for sites including cost and convayance and labour charges etc complete
Cement Concrete 1:2:4 mix using 20 mm size ISS HBG metal including cost and conceyance of all materials and to site labour charges, etc, complete
Construction of granular sub based by providing well graded material (25mm to 4.75mm IRC HBG metal @ 65%, 4.75 to 2.36mm IRC HBG metal @ 20% & 2.36mm below IRC HBG metal @ 15% ) spreading in uniform layers with motor grader on prepared surface
Providing and laying of interlocking concrete block( surface texture) pavements having thickness 60mm and compacked over a thin bedding sand layer of 25mm thickness and joint shall be filled by find sand of specified grading as per table 1500.6 of spec
Part III : Construction of PDS in Jambampattu at Nadukuppam Panchayat (Full time Shop)
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., as directed by the departmental officers complete complying with standard specifications.
Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Basement
Above Basement (Super Structure)
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing
Supplying and erecting centering shuttering including necessary supports for plane etc., complete.
Below GL
Above GL
Floor finish with granolithic flooring in CC 1:2:4 mix using 10 to 12mm chips for 40mm thick including cost and conveyance of all materials and labours etc., complete
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per Sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. (The ceramic tiles should be got approved from the Departmental officers before execution).
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:3 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc complete.
Doors D
Doors D1
Window W(1.00x1.30)m
Ventilator V (0.90 x 0.60m)
Rolling shutter
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Labour Charges for Fixing the Doors inculding all Charges etc..
Labour Charges for Fixing theSteel Window inculding all Charges etc..
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board including all cost and conveyance and all labour charges etc .comp.
Cost and supply of Oriya type IWC with "P" or "S" trap etc., Complet (White)
Supply and fixixng of 15mm dia Brass CP screw down tap
Supply and fixixng of 1000 litre HDPE tank
Part IV : Construction of drain in Kil colony at Nadukuppam panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering and shuttering for sides including cost and conveyance and labour charges etc complete
Plastering with cement mortar 1:4(one cement and five sand) 20mm thick in all floors including curing etc complete compling with standard specification and as directed
Cement Concrete 1:2:4 mix using 20 mm size ISS HBG metal including cost and conceyance of all materials and to site labour charges, etc, complete
casting and fixing RCC pre cast slab75mm thick in CC 1:2:4 using 20mm HBGS excluding cost of reinforcement grill imposition including moulding curing and finishing etc complete complying with standard specifications
Part V : Construction of Threshing Floor in Near School at Nadukuppam panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angle
Cement Concrete 1:2:4 mix using 20 mm size ISS HBG metal including cost and conceyance of all materials and to site labour charges, etc, complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Rishika Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .