| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC DUE TO L1 |
| 2 | L2₹1.8 Cr+₹9.9 L (5.94%)Rejected-Finance | ₹1.8 Cr+₹9.9 L (5.94%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹4.4 L
Closing Date
5 Dec 2022, 12:00 pmClosed
SE IWC MIRZAPUR
SE IWC IRRIGATION COLONY FATHA MIRZAPUR
C.C LINING WORK OF REXWA MINOR,rEPAIRING OF PUCCA STRUCTURE AND RELAYING OF STONE BOULDER PITCHING AT REXWA BANDHI
2022_UPIDC_752848_1
NIT08/SE/2022-23
Open Tender
Civil Works
Item Wise
180 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹4.4 L
2 Feb 2023
25 Nov 2022
5 Dec 2022
25 Nov 2022
5 Dec 2022
25 Nov 2022
Amount
Ordinary Jungle Clearance Where Growth is continuous including cost of labour and T&P etc. complete in all respects.
Dismantling stone work in cement mortar including stacking of materials as directed by Engineer-in-charge within a distance of 60 m. including cost of labour and T&P etc. complete in all respects.
Dismantling existing plaster/pointing including disposal of refuse as directed by Engineer-in-charge within a distance of 60 m. including cost of labour and T&P etc. complete in all respects.
Dismantling old and damaged boulder/stone pitching including stacking of materials, cost of labour and T&P etc. complete in all respects.
Dismantling 1:4:8 cement concrete 150 mm. thickness including cost of labour and T&P etc. complete in all respects.
Earth work in cutting with all type of ordinary soil mixed with cherry, moorum etc. including all initial lead and lift including excavation, refilling of excavated earth into trenches and making bed slope and side slope as per drawing & specification including all lead, lift, labour and T&P etc. complete in all respects.
Earth work in excavating other rocks by blasting and disposal of excavated materials as per direction of Engineer-in-charge and making bed slope and side slope as per drawing & specification including all lead, lift, labour and T&P etc. complete in all respects.
Preparation of subgrade for lining and pitching work excuding cost of earth work including cost of all material, labour, T&P, Taxes etc. required for proper completion of work.
Supply and Laying Dry stone boulder pitching in U/s of slope of bundhi including cost of all materials, labour , T & P, taxes etc, required for proper completion of work. as per direction of Engineer- in- charge.
(b) Laying Dry stone boulder pitching in U/s of slope of bundhi including cost of all materials, labour , T & P, taxes etc, required for proper completion of work. as per direction of Engineer- in- charge (Departmental Stone boulder available on site).
Centering and shuttering for cement concerete lining work including cost of all material labour T & P etc
P/L 100 mm thick Local sand in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work.
P/L 100 mm thick Kattal in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Supplying and laying LDPE film (200 micron) on subgrade before lining per sqm. including cost of all material, labour, T&P, Taxes etc. for proper completion of work.
Laying C.C. (1:3:6) in foundation with cement, course sand and hard stone ballast including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
(a) Laying C.R. stone masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
(b) Laying C.R. stone masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work(Departmental C.R. stone available on site).
Cement sand (1:2) pointing on stone masonery including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying CC (1:2:4) for floor and wearing coat work with cement, course sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying CC (1:2:4) for Lining work with cement, course sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying R.C.C M-20 grade for sleeper 200x 200 mm size including all cost of material, labour, T&P, Taxes etc., required for proper completion of work.
Carriage ,cutting,bending,biding and placing of Reinforcement including all cost of material ,labour T & P etc,Required for proper completion of work
Providing and fixing of M.S. Pipe 500 mm. dia including cost of all material, labour, T&P, taxes etc. for proper completion of work
Making construction joint painting with sealing compound including cost of all material, labour, T&P, Taxes etc. require for proper completion of work.
E/w filling in canal and bundhi embankment with good earth total lead upto 1.0 km. by truck or tractor trolley Along with Proper dressing and watering to compaction including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Replace of new Sluice gate including cost of all material, labour, T&P, taxes etc. for proper completion of work
Supply & fixing 1000 mm dia R.C.C Hume NP-3 Pipe for Drainage X- ing inciuding collars/spigot jointed With stiff mixture of cement in the proportion of 1:2(1 cement:2 fine sand ) including testing of joint etc. for proper completion of work.
Supply & fixing 600 mm dia R.C.C Hume NP-3 Pipe for Pipe Syphone inciuding collars/spigot jointed With stiff mixture of cement in the proportion of 1:2(1 cement:2 fine sand ) including testing of joint etc. for proper completion of work.
S.B. ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .