Loading…
Loading…
Tender Value
₹3.9 L
EMD Value
₹7,760
Closing Date
7 Aug 2026, 6:00 pm
Executive Engineer, REW Jammu
Office of the Executive Engineer, REW Jammu
Constt. Of L/drain near moh. Retd. Lect. tarsem choudary at jattan da kothey pyt. Dehrian Block Khour-, Distt Jammu Under the head CAPEX Budget (PRI PLAN) for the year of 2026-27
2026_RDPR_317549_6
e-NIT No. 251 REWJ of 2026-27 dated 23-07-2026
Open Tender
Civil Works
Percentage
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH0515
₹7,760
24 Jul 2026
24 Jul 2026
8 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches foundations, drains,pipes, cables etc(not exceeding 1.5m in width)including dressing of sides and ramming of bottom lifts upto 1.5m inc.getting out excavated earth & disposal of surplus excavated earth as directed:in all kinds of soil | 12.15 | cum. | 479.3 | ₹5,823.5 |
| 2 | P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 14.41 | cum. | 4,826.5 | ₹69,555.9 |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 28.49 | cum. | 5,733.6 | ₹1,63,321.6 |
| 4 | Reinforced cement concrete including curing but excluding the cost of centering,shuttering and reinforcement withl 1:1.5:3 (1 Cement:1.5 Coarse sand:3 Graded stone aggregate 20mm nominal size) | 0.23 | cum. | 7,788.4 | ₹1,752.39 |
| 5 | Steel Reinforcement for RCC Work including straightening,cutting,bending, placing in position and binding all complete above plinth level . Cold twisted bars | 20.25 | Kg | 123.2 | ₹2,494.8 |
| 6 | Centring & shuttering including strutting, propping etc. and removal of the formwork. | 115.2 | sqm. | 286.35 | ₹32,987.52 |
| 7 | Suspended floor | 0.9 | sqm. | 718.2 | ₹646.38 |
| 8 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 108 | sqm. | 816.15 | ₹88,144.2 |
| 9 | P/L in position Cement conc. 1 cement:2fine sand:4graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 1.3 | cum. | 6,591.25 | ₹8,568.63 |
| 10 | sand 06 KM by MT | 20 | cum. | 216.4 | ₹4,328 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1042067.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].