| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -40.86% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.1 L+₹24,207.36 (8.39%)Admitted-Fee/PreQual/Technical/Finance | -35.90% | ₹3.1 L+₹24,207.36 (8.39%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.2 L+₹26,891.65 (9.32%)Admitted-Fee/PreQual/Technical/Finance | -35.35% | ₹3.2 L+₹26,891.65 (9.32%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.2 L+₹28,599.83 (9.91%)Admitted-Fee/PreQual/Technical/Finance | -35.00% | ₹3.2 L+₹28,599.83 (9.91%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.6 L+₹72,524.47 (25.1%)Admitted-Fee/PreQual/Technical/Finance | -26.00% | ₹3.6 L+₹72,524.47 (25.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹9,760
Closing Date
10 Sept 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_323193_16
e.NIT No. 155 REW UDHAMPUR of 2026.27 Dated 02-09-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹9,760
14 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil : | 280 | sqm | 91.75 | ₹25,690 |
| 2 | Earthwork in bulk excavation by mechanical means (hydraulic excavator) disposal upto 50 mtrs and lift upto 1.50 mtrs including getting out the excavated soil with (20 % o/rock and 80% all kinds of soil ) : | 9.6 | cum | 392.8 | ₹3,770.88 |
| 3 | Earthwork in bulk excavation by mechanical means (hydraulic excavator) disposal upto 50 mtrs and lift upto 1.50 mtrs including getting out the excavated soil with (20 % o/rock and 80% all kinds of soil ) : | 38.4 | cum | 187.3 | ₹7,192.32 |
| 4 | E/work in trench excavation by mechanical means (hydraulic excavator) lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.A.K.S | 129.8 | cum | 256.85 | ₹33,339.13 |
| 5 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 5.82 | cum | 4,826.5 | ₹28,090.23 |
| 6 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 31.72 | cum | 5,733.6 | ₹1,81,869.79 |
| 7 | P/laying (1 cement :1.5 fine sand :3 graded crushed stone aggregates ) mix c.concrete for RCC works using 20 mm n/s agg and curing complete excluding cost of centering and shuttering of all works upto p/leve | 0.45 | cum | 7,788.4 | ₹3,504.78 |
| 8 | P/laying steel reinforcement for RCC works including strainhtening, cutting, bending, and placing in all positions and binding all complete : | 38.44 | kg | 123.2 | ₹4,735.81 |
| 9 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 2.25 | Sqm | 718 | ₹1,615.5 |
| 10 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 46.3 | Sqm | 286.35 | ₹13,258.01 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1087019.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .