Loading…
Loading…
Tender Value
₹53.5 L
EMD Value
₹4.7 L
Closing Date
26 Sept 2026, 12:00 pm4d left
SE Jaunpur Ghazipur Circle PWD Jaunpur
SE Jaunpur Ghazipur Circle PWD Jaunpur
Construction work of Uttarpatti Kewat basti Link Road (including 5-year maintenance)
2026_CEUVZ_1182807_10
4431/SETender/jnp-gzp circle/26 Date-25-08-2026
Open Tender
Civil Works
Percentage
120 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.7 L
Yes
SE Jaunpur Ghazipur Circle PWD Jaunpur
26 Sept 2026
10 Sept 2026
26 Sept 2026
10 Sept 2026
26 Sept 2026
10 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Right of way:- Construction of embankment with approved material obtained from Right of way with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5I (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 3,350 | Cum | 72 | ₹2,41,200 |
| 2 | Providing & Laying of compacted thickness of Granular Sub Base( GSB) Grading-I Stone ballast of approved quarry by providing well graded material , specification in uniform layer with motor grader on prepared surface , mixed by mix in place method rotavator at OMC, and compacting with smooth wheel roller to achieve the desireed density , complete as per technical specification Clause 401as per direction of E/l (Including all material, T&P, labour cess etc. but excluding G.S.T.) | - | Cum | 2,400 | - |
| 3 | Providing laying spreading and compacting (22.4-53mm) stone aggregate of specific sizes to Water bound Mcadam specification including spreading in uniform thichness hand packing, rolling with 3-wheel 80-100 kN static roller in stages to proper grade and camber to 7.50 cm compacted thickness applying and brooming stone screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading-3 as per Technical Specification. Clause 405. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 225 | Cum | 3,080 | ₹6,93,000 |
| 4 | Cement Concrete Pavement - Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 450 | Cum | 8,320 | ₹37,44,000 |
| 5 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from Right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1..(Including all material, T&P, labour cess etc. but excluding G.S.T.) | 850 | Cum | 61 | ₹51,850 |
| 6 | PART A
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 | 1.6 | Cum | - | - |
| 6.1 | 1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1 | Km | - | - |
| 6.2 | 2nd year- maintainance cost 0.25% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | - | Km | - | - |
| 6.3 | 3rd year- maintainance cost 0.50 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | - | Km | - | - |
| 6.4 | 4th year- maintainance cost 0.75% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | - | Km | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.83 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2224317.xls
BOQ • 0.24 MB
4711cd2.pdf
PDF • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .