Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-Finance | L1 | Accepted-Finance As per BOQ comparative. | |
| 2 | L2₹34.4 L+₹8.9 L (34.9%)Accepted-Finance PHAYANG GOMPA COMPLEX AGLING ROAD SKALZANGLING LEH LADAKH J K 194101 | LEH | LEH | LADAKH | 194101 | L2 | Accepted-Finance As per BOQ comparative. | |
| 3 | L3₹35.4 L+₹9.9 L (38.7%)Accepted-Finance | L3 | Accepted-Finance As per BOQ comparative. | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹28.1 L
EMD Value
₹56,160
Closing Date
8 Dec 2020, 4:00 pmClosed
Executive Engineer SSD Nobra
Executive Engineer SSD Nobra
Providing and laying of 100mm thick WMM and 25mm thick SDBC on link road to Yourgut and Takldan Trith.Under D.P
2020_PWD_825_5
SSD/N/12 of 2020-21
Open Tender
Civil Works - Roads
Item Rate
25 days
Nobra
Please refer to tender document
6 documents required · 6 mandatory
₹1,000
Yes
Payable To Executive Engineer SSD Nobra
₹56,160
Yes
21 Dec 2020
25 Nov 2020
10 Dec 2020
25 Nov 2020
8 Dec 2020
25 Nov 2020
25 Nov 2020 - 8 Dec 2020
Amount
Surface dressing of ground including removing vegetation and in-equality not exceeding 15cm deep and disposal of rubbish, lead upto 50mtr and lift upto 1.5mtr.in all kind of soil.
Consoladiting of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulation etc. with earth or quarry spoils etc. and rerolling the subgrade.
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the ,. material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub-base I base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
Providing and applying tack coat using bitumen emulsion (Rapid Setting) complying with IS 8887-1995. spraying the bitumen emulsion with mechanically operated spray unit, cleaning and prepariRg the existing road surface as per specifications.On W.M.M. @ 0.4 Kg/sqm.
Providing HMP ready mix laying and paver and compaction of 25mm thick SDBC after application of tack coat @ 2.50 kg/sqm, including loading of aggregate, filler and bitumen in hot mixing of stone aggregate, filler and bitumen in hot mix plant, transporting the mix material by tipper to paver finished fitted with mechanical device not the required level and grade and rolling by road roller as per MORTH specification to achieve the desired density but excluding the cost of tack coat.(Including carriage complete job)
Betong Construction Co
M/S RINCHEN WANGCHUK
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .