| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical AVAS VIKAS NANDANPURA JHANSI UP 284003 | JHANSI | UTTAR PRADESH | 284003 | Accepted-Technical BIDDER HAS REQUISITE CLASS AND b (i) CATEGORY. BIDDER HAS BEEN AWARDED AND EXECUTED SIMILAR NATURE OF WORKS IN PAST. BIDDER HAS APPLIED TO THE ENLISTIG AUTH FOR ADDING CATEGORY VIDE LETTER NO NIL DATED 07AUG 2026 |
| 2 | Accepted-Technical 2 EVEREST VIHAR PT T N MISHRA MARG NIRMAN NAGAR JAIPUR 302019 | JAIPUR | RAJASTHAN | 302019 | Accepted-Technical ELIGIBLE BID RECOMMENDED FOR OPENING OF FIN BIDS |
| 3 | Rejected-Technical SHIVAJI NAGAR GALI NO 1 DHANGU ROAD MODEL TOWN PATHANKOT 145001 PB | PATHANKOT | PATHANKOT | PUNJAB | 145001 | Rejected-Technical BIDDER DID NOT SUBMITTED SELF ATTESTED RESIDUAL WORK LOAD AS ON DATE INSPITE OF TWO SHORTFALL WINDOW OPPORTUNITIES GIVEN |
Tender Value
₹71.7 L
EMD Value
₹1.3 L
Closing Date
3 Sept 2026, 6:00 pmClosed
CWE (A) Jaisalmer
HQ CWE (A) JAISALMER
SPL REPAIRS FOR RENEWAL AND REPLACEMENT OF TRANSFORMERS AND VOLTAGE STABLIZERS AGAINST BER WITH CONNECTED ITEMS AT JALIPA MILITARY STATION AND VARIOUS ASCON NODES UNDER GE (A) BARMER
2026_MES_781605_1
84465/C/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
BARMER
AS PER NIT
8 documents required · 8 mandatory
₹1,000
GE ARMY BARMER
₹1.3 L
Yes
19 Sept 2026
30 Jul 2026
5 Sept 2026
30 Jul 2026
3 Sept 2026
20 Aug 2026
30 Jul 2026 - 6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down the existing 11KV/433V step down distribution transformers any capacity with existing ACSR conductors in the AOR of AGE E/M Barmer ( Jalipa Mil Stn and ASCON Nodes) by disconnecting HT and LT cables on both sides of the winding and shifting the transformers at MES Store yard Jalipa complete all as specified and directed.
Note :- (i) The cost of T&P and Transportation should be included in the quoted rate by the contractor.
(ii) Taking out of old u/s ACSR connected conductors rates deemed to be included in quoted rates. | 10 | Each Job | 99 | ₹990 |
| 2 | Taking down the existing servo voltage stabilizers any capacity in the AOR of AGE E/M Barmer ( Jalipa Mil Stn and ASCON Nodes) by disconnecting all connecting cables and shifting at MES Store yard Jalipa complete all as specified and directed.
Note :- The cost of T&P and Transportation should be included in the quoted rate by the contractor. | 5 | Each Job | 100 | ₹500 |
| 3 | Supplying, installing, testing and commissioning of AC 3 phase, 50 Hz,63 KVA capacity transformer, step down, outdoor type, 11000/433 Volts (at no load) all as per IS 1180 (Part-1): 2014, copper wound, oil immersed, naturally cooled with external cooling tubes, ONAN cooling, core type, delta connected on primary (HV) side and star connected on secondary (LV) side in accordance with vector symbol DYN-11 with neutral brought out on secondary (LV) side and having tappings in equal steps of 2.5% from (+) 2.5% to (-) 5% on primary side by means of hand operated off load tap changing gear, so as to change/correct LT voltage on secondary side including provision of all necessary/standard fittings, all as per latest IEC 76 amendments and Energy Efficiency Level-2 Transformer as per IS 1180 (Part-1): 2014 complete as specified and as directed, comprising of the following accessories:
(a) The core shall be stack/wound type of high grade Cold Rolled Grain Oriented steel (IS 3024) or Amorphous Core annealed steel lamination having low loss and good grain properties, coated with hot oil proof inter layer insulation of Nomex / Epoxy dotted Kraft Paper, bolted together and to the frames firmly to prevent vibration or noise. The core shall be stress relieved by annealing under inert atmosphere if required. The complete design of core must ensure no load/ core loss should be minimum with continuous working of the transformers. LV winding shall be such that neutral formation will be at top making it moreconnection convenient.
(b) The maximum allowable losses at 75°C for 11/0.433 kV at 50% of rated load and total losses at 100% of rated load shall not exceed the maximum total loss of 340 Watts and 1140 Watts respectively without any positive tolerance, all as per specified in IS-1180 (Part-1): 2014.
(c) The percentage impedance of transformer at 75°C for 63 KVA shall be 4.5 percentage as per Table 3 of IS-1180 (Part-1): 2014.
(d) The rated Basic Insulation Level (BIL) shall be 75 KVp as per Table 2 of IS-1180 (Part-1): 2014. | 2 | Each | 100 | ₹200 |
| 3.01 | Item 3 contd...
(e) Transformer tank construction shall be conform para 15 of IS 1180 Part-1 : 2014.It can be with radiator fins or cooling tubes. The tank covers shall be bolted /clamped alternatively welded with tank rim so as to make leak proof joint. The tank shall be of adequate mechanical strength to withstand positive and negative pressure built up during Transformer operation and all weldings operations shall be carried out by qualified welders.
(f) A suitable cable box on primary side HV consisting three Nos of HT porcelain bushings with brass/gun metal bushing rods conforming to IS 2099 and IS-3347. A suitable cable box on secondary side LV consisting four Nos of porcelain bushings with Gun metal bushing rods complete with nuts and washers conforming to IS 7421. The bushings shall be fixed with straight pockets and in the same plane or the top cover. The Minimum clearance in cable boxes shall be provided as per Para 11.1 of IS 1180 Part 1 : 2014.
(g) The conservator must be provided with oil gauge, air release plug and breathing device shall be fixed to the conservstor, it also includes drain plug and a filling hole of 32 mm with cover. The capacity of a conservator tank shall be designed keeping in view the total quantity of oil and its contraction and expansion due to temperature variations.The silical gel crystal in beather to be filled for moisture absorption.
(h) The painting of transformer shall be conform para 15.5 of IS 1180 Part 1 : 2014. Inside of the transformer shall be painted with varnish or oil resistant paint and outside shall be painted one coat of thermo setting powder paint or one coat of epoxy primer followed by two coats of polyurethene base paint.
(j) The rating plate and terminal marking shall be as per fig 1 and fig 3 of IS 1180 Part 1 : 2014. | - | - | - | - |
| 3.02 | Item 3 contd...
(k) Two earthings terminals on tank cover for GI earthing strip fixing, Lifting Lugs and four plane steel detachable rollers and one extra bushing for neutral outside the LT cable box for provided independent earthing for neutral.
(l) Fresh fill of transformer oil conforming to IS-335.
(m) Provisons of 02 Nos danger plates (M.S.) on both HV and LV sides.
(n) Rate for suitable platform for the transformer as per OEM should be included in the quoted rate by the contractor. | - | - | - | - |
| 4 | Supplying, installing, testing and commissioning of AC 3 phase, 50 Hz, 100 KVA capacity transformer, step down, outdoor type, 11000/433 Volts (at no load) all as per IS 1180 (Part-1): 2014, copper wound, oil immersed, naturally cooled with external cooling tubes, ONAN cooling, core type, delta connected on primary (HV) side and star connected on secondary (LV) side in accordance with vector symbol DYN-11 with neutral brought out on secondary (LV) side and having tappings in equal steps of 2.5% from (+) 2.5% to (-) 5% on primary side by means of hand operated off load tap changing gear, so as to change/correct LT voltage on secondary side including provision of all necessary/standard fittings, all as per latest IEC 76 amendments and Energy Efficiency Level-2 Transformer as per IS 1180 (Part-1): 2014 complete as specified and as directed, comprising of the following accessories:
(a) The core shall be stack/wound type of high grade Cold Rolled Grain Oriented steel (IS 3024) or Amorphous Core annealed steel lamination having low loss and good grain properties, coated with hot oil proof inter layer insulation of Nomex / Epoxy dotted Kraft Paper, bolted together and to the frames firmly to prevent vibration or noise. The core shall be stress relieved by annealing under inert atmosphere if required. The complete design of core must ensure no load/ core loss should be minimum with continuous working of the transformers. LV winding shall be such that neutral formation will be at top making it moreconnection convenient.
(b) The maximum allowable losses at 75°C for 11/0.433 kV at 50% of rated load and total losses at 100% of rated load shall not exceed the maximum total loss of 475 Watts and 1650 Watts respectively without any positive tolerance, all as per specified in IS-1180 (Part-1): 2014.
(c) The percentage impedance of transformer at 75°C for 100 KVA shall be 4.5 percentage as per Table 3 of IS-1180 (Part-1): 2014.
(d) The rated Basic Insulation Level (BIL) shall be 75 KVp as per Table 2 of IS-1180 (Part-1): 2014. | 5 | Each | 100 | ₹500 |
| 4.01 | Item No 4 contd..
(e) Transformer tank construction shall be conform para 15 of IS 1180 Part-1 : 2014.It can be with radiator fins or cooling tubes. The tank covers shall be bolted /clamped alternatively welded with tank rim so as to make leak proof joint. The tank shall be of adequate mechanical strength to withstand positive and negative pressure built up during Transformer operation and all weldings operations shall be carried out by qualified welders.
(f) A suitable cable box on primary side HV consisting three Nos of HT porcelain bushings with brass/gun metal bushing rods conforming to IS 2099 and IS-3347. A suitable cable box on secondary side LV consisting four Nos of porcelain bushings with Gun metal bushing rods complete with nuts and washers conforming to IS 7421. The bushings shall be fixed with straight pockets and in the same plane or the top cover. The Minimum clearance in cable boxes shall be provided as per Para 11.1 of IS 1180 Part 1 : 2014.
(g) The conservator must be provided with oil gauge, air release plug and breathing device shall be fixed to the conservstor, it also includes drain plug and a filling hole of 32 mm with cover. The capacity of a conservator tank shall be designed keeping in view the total quantity of oil and its contraction and expansion due to temperature variations.The silical gel crystal in beather to be filled for moisture absorption.
(h) The painting of transformer shall be conform para 15.5 of IS 1180 Part 1 : 2014. Inside of the transformer shall be painted with varnish or oil resistant paint and outside shall be painted one coat of thermo setting powder paint or one coat of epoxy primer followed by two coats of polyurethene base paint.
(j) The rating plate and terminal marking shall be as per fig 1 and fig 3 of IS 1180 Part 1 : 2014. | - | - | - | - |
| 4.02 | Item No 4 contd..
(k) Two earthings terminals on tank cover for GI earthing strip fixing, Lifting Lugs and four plane steel detachable rollers and one extra bushing for neutral outside the LT cable box for provided independent earthing for neutral.
(l) Fresh fill of transformer oil conforming to IS-335.
(m) Provisons of 02 Nos danger plates (M.S.) on both HV and LV sides.
(n) Rate for suitable platform for the transformer as per OEM should be included in the quoted rate by the contractor. | - | - | - | - |
| 5 | Supplying, installing, testing and commissioning of AC 3 phase, 50 Hz, 250 KVA capacity transformer, step down, outdoor type, 11000/433 Volts (at no load) all as per IS 1180 (Part-1): 2014, copper wound, oil immersed, naturally cooled with external cooling tubes, ONAN cooling, core type, delta connected on primary (HV) side and star connected on secondary (LV) side in accordance with vector symbol DYN-11 with neutral brought out on secondary (LV) side and having tappings in equal steps of 2.5% from (+) 5% to (-) 10 % on primary side by means of hand operated off load tap changing gear, so as to change/correct LT voltage on secondary side including provision of all necessary/standard fittings, all as per latest IEC 76 amendments and Energy Efficiency Level-2 Transformer as per IS 1180 (Part-1): 2014 complete as specified and as directed, comprising of the following accessories:
(a) The core shall be stack/wound type of high grade Cold Rolled Grain Oriented steel (IS 3024) or Amorphous Core annealed steel lamination having low loss and good grain properties, coated with hot oil proof inter layer insulation of Nomex / Epoxy dotted Kraft Paper, bolted together and to the frames firmly to prevent vibration or noise. The core shall be stress relieved by annealing under inert atmosphere if required. The complete design of core must ensure no load/ core loss should be minimum with continuous working of the transformers. LV winding shall be such that neutral formation will be at top making it moreconnection convenient.
(b) The maximum allowable losses at 75°C for 11/0.433 kV at 50% of rated load and total losses at 100% of rated load shall not exceed the maximum total loss of 980 Watts and 2930 Watts respectively without any positive tolerance, all as per specified in IS-1180 (Part-1): 2014.
(c) The percentage impedance of transformer at 75°C for 250 KVA shall be 4.5 percentage as per Table 6 of IS-1180 (Part-1): 2014.
(d) The rated Basic Insulation Level (BIL) shall be 75 KVp as per Table 5 of IS-1180 (Part-1): 2014. | 2 | Each | 100 | ₹200 |
| 5.01 | Item No 5 contd..
(e) Transformer tank construction shall be conform para 15 of IS 1180 Part-1 : 2014.It can be with radiator fins or cooling tubes. The tank covers shall be bolted /clamped alternatively welded with tank rim so as to make leak proof joint. The tank shall be of adequate mechanical strength to withstand positive and negative pressure built up during Transformer operation and all weldings operations shall be carried out by qualified welders.
(f) A suitable cable box on primary side HV consisting three Nos of HT porcelain bushings with brass/gun metal bushing rods conforming to IS 2099 and IS-3347. A suitable cable box on secondary side LV consisting four Nos of porcelain bushings with Gun metal bushing rods complete with nuts and washers conforming to IS 7421. The bushings shall be fixed with straight pockets and in the same plane or the top cover. The Minimum clearance in cable boxes shall be provided as per Para 11.1 of IS 1180 Part 1 : 2014.
(g) The conservator must be provided with oil gauge, air release plug and breathing device shall be fixed to the conservstor, it also includes drain plug and a filling hole of 32 mm with cover. The capacity of a conservator tank shall be designed keeping in view the total quantity of oil and its contraction and expansion due to temperature variations.The silical gel crystal in beather to be filled for moisture absorption.
(h) The painting of transformer shall be conform para 15.5 of IS 1180 Part 1 : 2014. Inside of the transformer shall be painted with varnish or oil resistant paint and outside shall be painted one coat of thermo setting powder paint or one coat of epoxy primer followed by two coats of polyurethene base paint.
(j) The rating plate and terminal marking shall conform fig 1 and fig 3 of IS 1180 Part 1 : 2014. | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_875615.xls
BOQ • 0.27 MB
TENDER1.pdf
Tender Documents • 2.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .