Construction work of 3x6.00 m span RCC minor bridge at Km. 21 of Semri Bansura Bhagwatipur Dehla Dharohara Road (ODR).
2026_CEUCZ_1125411_7
825/352C/E.TENDER/STP-LMP/25 Dt. 09.02.2026
Open Tender
Civil Works - Roads
365 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹14.8 L
Yes
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
16 Apr 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
16 Mar 2026
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Sand Filling in Foundation below Box Culvert base as per Drawing & Technical specification.
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 using batching plant & Concrete pump.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant & Concrete pump.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M20 using batching plant transit mixer & Concrete Pump
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 40 kg laid dry complete as per drawing and MORD specifications Clause 1301
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of granular sub-base Dismentelled Material of Existing culvert by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(Only Labour Work) For Diversion
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (1000mm dia)
Brick soiling with straight overburnt brick laid on edge including preparation of subgrade to prescribed camber ard including supply of briks, fillingjoints, with local earth spreading blinding coats I cm. (3/8") deep of local earth of P.L 5 to 7 or sand over the entire surface & including labour and T&P etc. requted for proper completion of work. PWD 762b
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_2097881.pdf
BOQ Comparative Chart
xlsx
finsummary_2097881.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tendernotice_2.pdf
PDF • 0.75 MB
BOQ_2097881.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid