| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹20.9 L+₹1.1 L (5.53%)Admitted-Finance NA | L2 | Admitted-Finance |
Tender Value
₹19.9 L
EMD Value
₹39,729
Closing Date
16 Apr 2026, 6:00 pmClosed
Executive Engineer
HPPWD Rohru
C o JE office at Tikkar SH C o Building portion and W S and S I
2026_PWD_133648_21
448-57 DATED 7-4-2026
Open Tender
Civil Works - Roads
Percentage
120 days
Rohru
Please refer Tender documents.
11 documents required · 11 mandatory
₹500
₹39,729
12 May 2026
8 Apr 2026
17 Apr 2026
8 Apr 2026
16 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in exavation for structure in all depths as per drawings and technical specification as per clause 305.1 (three hundred five point one) of MORD specifications 300 (three hundred) including setting out construction of shoring and tacing removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filing in trenches with excavated suitable materials. All work of rocks cutting by blasting shall be carried out taking all necessary precautions against soil ersosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and weding out rocks . All earthwork in excavation excuding rock excavation shall be carried out true to lines, grades sides slopes, width camber , superelevation and level as down on the drawings, Disposal of surfaceable cut materials in specified manner on dumping site through all modes of transportation including head loads, animal loads or mechanical means along with its leveling fine dressing and all labour , machineries, materials, tools, equipment and safety measures and incidental necessary to complete. If the founadation of the structure is in an area with stagnant water or water is met with in the excavation due to the spring seepage, rain and other causes shall be removed by suitable diversion, bailing outm or dewatering and the area of foundation or embankment shall bekeptv dry. Any loss to the public and private property during the course of execution shall be absolute responsibility of the contractor which shall have to be the duly compensated by him at his own cost in all cases. | - | Per cubic metre | - | - |
| 2 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in: Foundation, footings basis of columns etc. and mass concrete. | - | Sqm. | - | - |
| 3 | Flat surfaces such as soffit of suspeneded floors, roofs, landing like floors etc. upto any thickness | - | Sqm. | 576 | - |
| 4 | Beams, cantilever, girder and lintels sides and soffit of beams, beam hunchimg, cantilever, bressumers and lintels in any depth in all height from floor. | - | Sqm. | 437 | - |
| 5 | Columns, pillars, posts and struts Square, rectangular or polygonal in plan. | - | Sqm. | - | - |
| 6 | Staircases with sloping or stepped soffits excluding landing | - | Sqm. | 437 | - |
| 7 | Edges of slab and breaks in floor and walls under any width | - | Rmt | 129 | - |
| 8 | Providing and laying cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in:foundation and plinth including carriage of material within all leads and lifts complete in all respect as per direction and satisfaction of Engineer in charge | - | Per cubic metre | 4,900 | - |
| 9 | Providing and laying cement concrete 1:4:8 (1 cement:4 sand:8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in: Foundation and plinth as per direction and satisfaction of Engineer in charge | - | Per cubic metre | 5,484 | - |
| 10 | Providing and laying cement concrete work 1:1.5:3 (1 cement : 1.5 sand :3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : Foundation, footing basis of column etc. and mass concrete | - | Per cubic metre | 9,569 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
SBD21.pdf
Tender Documents • 2.49 MB
BOQ_197674.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .