| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.2 LAccepted-AOC | L1 | Accepted-AOC AOC L1 | |
| 2 | L2₹49.6 L+₹42,606.40 (0.87%)Accepted-AOC PAUTUA CHANDAULI | L2 | Accepted-AOC AOC L2 Reject |
| Sl No | Description | Qty | Unit | M/S RUCHI CONSTRUCTION CO L1 | SARTHAK ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | E/W in excavation of foundation for all structures in all types of soil including all leads, lifts and proper disposal and back filling as per direction of E/I including cost of T&P & labour etc required for proper completion of work. | 540 | M3 | 40 ₹21,600 Lowest | 80 ₹43,200 |
| 2.00 | Earthwork in filling in embankment of minor by borrowing from private land in all types of soils including lift upto 3.0m with maunal compaction and dressing required for proper completion of work including cost of al T & P. labour etc. | 6,038.72 | M3 | 80 ₹4,83,097.6 Lowest | 200 ₹12,07,744 |
| 3.00 | Centering & shuttering of C.C work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc. | 1,135.44 | M2 | 200 ₹2,27,088 Lowest | 300 ₹3,40,632 |
| 4.00 | Boulder Pitching with filling of voids with M-15 grade concrete. | 186.19 | M3 | 7,000 ₹13,03,330 Lowest | 7,000 ₹13,03,330 Lowest |
| 5.00 | Laying C.C.A20 - M-15 with cement (OPC 43 grade),coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc. | 63.16 | M3 | 10,000 ₹6,31,600 | 9,800 ₹6,18,968 Lowest |
| 6.00 | Supply & Laying of Geo textile (sheet) made of 240 GSM Woven multifilament polyprophylene yarn. | 1,320 | M2 | 100 ₹1,32,000 | 83 ₹1,09,560 Lowest |
| 7.00 | Carring & laying stone Boulder ( Weight from 20-40Kg and min dimension of 200mm) for canal outer slope protection without create and apron required for proper completion of work including cost of all material, T&P & labour etc. | 325.88 | M3 | 6,500 ₹21,18,220 | 4,100 ₹13,36,108 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
29 May 2025, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, Rapti Nahar Nirman Mandal-2, Basti (U.P.)
PROTECTION WORK FOR FALL ON RAPTI MAIN CANAL AT KM 104.800 AND KM 110.100 In Distict Siddharth Nagar
2025_UPIDC_1040038_1
Tender Notic 01/SE/2025-26
Open Tender
Civil Works
Item Wise
90 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.2 L
Yes
19 Aug 2025
19 May 2025
29 May 2025
19 May 2025
29 May 2025
19 May 2025
Amount
E/W in excavation of foundation for all structures in all types of soil including all leads, lifts and proper disposal and back filling as per direction of E/I including cost of T&P & labour etc required for proper completion of work.
Earthwork in filling in embankment of minor by borrowing from private land in all types of soils including lift upto 3.0m with maunal compaction and dressing required for proper completion of work including cost of al T & P. labour etc.
Centering & shuttering of C.C work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc.
Boulder Pitching with filling of voids with M-15 grade concrete.
Laying C.C.A20 - M-15 with cement (OPC 43 grade),coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc.
Supply & Laying of Geo textile (sheet) made of 240 GSM Woven multifilament polyprophylene yarn.
Carring & laying stone Boulder ( Weight from 20-40Kg and min dimension of 200mm) for canal outer slope protection without create and apron required for proper completion of work including cost of all material, T&P & labour etc.
SARTHAK ENTERPRISES (BID ID -5222984)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .