Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
23 Jun 2026, 5:00 pm
Chief Officer
Lmc Office, Lonavala, Tal-Maval, Dist-Pune
Yearly Drainage line Chamber Repairing works and Property Connections
2026_DMA_1308199_1
Lmc 7/ Yearly Drainage line Chamber Maintenance /2026-27/1
Open Tender
Civil Works - Others
365 days
Lonavla
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹30,000
12 Jun 2026
12 Jun 2026
25 Jun 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Item No 1 :- Excavation in Soil - Excavation for foundation / pipe trenches in earth, soils of all types, sand, ravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A- 1/259) | - | Cum | 168.3 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Item No 2 :-Excavation in hard murum - Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-2/259) | - | Cum | 190.74 | - | - |
| 3 | Item No 3 :-Excavation in hard murum - Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-3/259) | - | Cum | 215.22 | - | - |
| 4 | Item No 4 :-Excavation in soft rock - Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A- 4/259) | - | Cum | 641.58 | - | - |
| 5 | Item No 5 :-Excavation in hard rock -Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259) | - | Cum | 1,141.38 | - | - |
| 6 | Item No 6 :-Dewatering - Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A-9/261) | - | Hp/Hr | 90.78 | - | - |
| 7 | Item No 7 :-Refilling - Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. | - | Cum | 93.84 | - | - |
| 8 | Item No 8 :-Murum bedding -Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) | - | Cum | 93.84 | - | - |
| 9 | Item No 9 :-Rubble stone soling -Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264) | - | Cum | 1,342.32 | - | - |
| 10 | Item No 10 :-Structural steel -Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates, etc. as per detailed design and drawing or as directed by Engineer-incharge including cutting, fabricating, hoisting, erecting and fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. (Bd-C-8/278) | - | MT | 1,16,677.8 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
B1DrainagelineChamberRepair.pdf
Tender Documents • 2.07 MB
BOQ_2244645.xls
BOQ • 0.30 MB
Annxure1.pdf
Additional Documents • 11.17 MB
EstDrainageYearlyMaintenane.pdf
Other Document • 0.08 MB
TermsAndConditions.pdf
Additional Documents • 0.32 MB
Download all tender documents and submit your bid