| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 LRejected-AOC | ₹5.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | C SIVAKUMAR L2 | SRI BALAJII CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 34 | M3 | 270.5 ₹9,197 | 258.6 ₹8,792.40 |
| 2.01 | Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 8 | M3 | 437.8 ₹3,502.40 | 418.5 ₹3,348 |
| 3.01 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 8 | M3 | 5,860.8 ₹46,886.40 | 5,603.1 ₹44,824.80 |
| 4.01 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) | 83 | M2 | 1,016.9 ₹84,402.70 | 972.2 ₹80,692.60 |
| 5.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only | 23 | M2 | 1,016.9 ₹23,388.70 | 972.2 ₹22,360.60 |
| 6.01 | Plain cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete | 18 | M3 | 8,041.8 ₹1.4 L | 7,688.1 ₹1.4 L |
| 7.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete | 6 | M3 | 9,769.7 ₹58,618.20 | 9,340.1 ₹56,040.60 |
| 8.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). | 660 | Kg | 98.1 ₹64,746 | 93.8 ₹61,908 |
| 9.01 | Add GST 18% | 1 | GST | 78,388.3 ₹78,388.30 | 74,941 ₹74,941 |
Tender Value
₹4.9 L
EMD Value
₹4,918
Closing Date
22 Jul 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Construction of Road cross culvert arrangement at Ganapathi nagar kurunji street in ward no 1
2025_MAWS_580285_1
E2/EST- 445/ 25-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,918
5 Feb 2026
14 Jul 2025
22 Jul 2025
14 Jul 2025
22 Jul 2025
14 Jul 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete
Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides)
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only
Plain cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also).
Add GST 18%
C SIVAKUMAR (BID ID -1407306)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid