| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC L1 Admit |
| 2 | L2₹4.2 LRejected-Finance | ₹4.2 L | L2 | Rejected-Finance L1 Admitted |
| Sl No | Description | Qty | Unit | MATHIYALAZHAKAN L2 | CGS MHALAKSHMI CONTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00NAME OF WORK : Construction of Pipe Culvert at Periyar Street Road at Cholanganallur Habitation in Thiruvathiraimangalam Panchayat (2 Nos) | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc | 40.78 | m3 | 275 ₹11,214.50 | 263 ₹10,725.14 |
| 3.00 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 2.88 | m3 | 2,706 ₹7,793.28 | 2,704.58 ₹7,789.19 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course | 3.82 | m3 | 6,716 ₹25,655.12 | 6,714.25 ₹25,648.44 |
| 5.00 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation | 28.88 | m3 | 7,021 ₹2.0 L | 7,017.3 ₹2.0 L |
| 6.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). | 79.8 | m2 | 551 ₹43,969.80 | 547.1 ₹43,658.58 |
| 7.00 | Supply and fixing of 0.900M pipe NP3 | 15 | Rm | 4,053 ₹60,795 | 4,052.2 ₹60,783 |
| 8.00 | Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 3.76 | m3 | 1,042 ₹3,917.92 | 1,040.2 ₹3,911.15 |
| 9.00 | Provision for Name board charges | 1 | Hr | 3,002 ₹3,002 | 3,000 ₹3,000 |
| 10.00 | Provision for Photo charges | 1 | Bill | 497 ₹497 | 495 ₹495 |
Tender Value
₹4.3 L
EMD Value
₹4,300
Closing Date
14 Jan 2026, 3:00 pmClosed
Block Development officer (v.pts), Tiruvarur
Market Road, Panchayat Union Office, tiruvarur
Rc.No.3523/B5 PMAGY25-26- RCC Pipe Culvert
2026_RDTN_640616_1
Rc.No.3523/B5 PMAGY25-26- RCC Pipr Culvert
Open Tender
Civil Works - Roads
Thiruvathiraimangalam Pt in Thiruvarur Block
Technical Specification as per tender Doc
3 documents required · 3 mandatory
₹0
₹4,300
Yes
13 Feb 2026
8 Jan 2026
14 Jan 2026
8 Jan 2026
14 Jan 2026
8 Jan 2026
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ).
Supply and fixing of 0.900M pipe NP3
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Name board charges
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
Tendernotice_2.pdf
PDF • 0.40 MB
Tendernotice_3.pdf
PDF • 0.80 MB
BOQ_767160.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid