Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | ₹10.6 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹10.8 L+₹16,253 (1.53%)Rejected-Finance | ₹10.8 L+₹16,253 (1.53%) | L2 | Rejected-Finance Quoted Higher |
| 3 | L3₹10.9 L+₹24,751 (2.33%)Rejected-Finance | ₹10.9 L+₹24,751 (2.33%) | L3 | Rejected-Finance Quoted Highest |
Tender Value
₹10.6 L
EMD Value
₹21,245
Closing Date
20 Mar 2026, 6:00 pmClosed
DWO, BCWTDD, GTA
Maldon Building, Darjeeling
GTA/DWO/BCW/NIeT-09(Sl. No. 05)/2025-26
2026_GTA_1018232_5
GTA/DWO/BCW/NIeT-09(Sl. No. 01-05)/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
Darjeeling
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹21,245
3 Aug 2026
6 Mar 2026
23 Mar 2026
6 Mar 2026
20 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Surface dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | |||||
| 2Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). | |||||
| 2.1 | (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. | - | SqMtr | - | - |
| 3Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. | |||||
| 3.1 | (b) River bazree. | - | CuMtr | - | - |
| 4 | Construction of "V" Drain | - | Nos | 1 | - |
| 5 | Add GST @ 18% | - | LS | 0.29 | - |
| 6Add Labour cess @ 1% | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
Tendernotice_2.pdf
PDF • 0.29 MB
BOQ_2502179.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .