Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-Finance 124 A NSC BOSE ROAD KOLKATA 700 092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | ₹1.4 Cr | L1 | Accepted-Finance Being L1 |
| 2 | L2₹1.5 Cr+₹12.2 L (8.71%)Accepted-Finance 1ST FLOOR MALVIYA NAGAR CEG MALVIYA INDUSTRIAL AREA B 11 G VILLAGE TOWN JAIPUR CITY JAIPUR JAIPUR RAJASTHAN 302017 INDIA | JAIPUR | RAJASTHAN | 302017 | ₹1.5 Cr+₹12.2 L (8.71%) | L2 | Accepted-Finance Not Being L1 |
| 3 | L3₹1.6 Cr+₹21.1 L (15.0%)Accepted-Finance | ₹1.6 Cr+₹21.1 L (15.0%) | L3 | Accepted-Finance Not Being L1 |
| 4 | Rejected-Technical 3 NEW TRIMURTY CO OP HOUSING SOCIETY INGOLE NAGAR WARDHA ROAD NAGPUR 440005 MAHARASTRA | NAGPUR | NAGPUR | MAHARASHTRA | 440005 | - | - | Rejected-Technical Not Substantially Responsive and Not Compliant to the requirements of the tender conditions |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Substantially Responsive and Not Compliant to the requirements of the tender conditions |
| Sl No | Description | Qty | Unit | CEG Test House And Research Centre Pvt. Ltd. L2 | C E TestingCompany Pvt Ltd L1 | Techpro Engineers Pvt. Ltd. L3 |
|---|---|---|---|---|---|---|
| 1.00Schedules | ||||||
| 1.01 | Schedule-1:
Geotechnical Investigation Study for the Underground Stations and Tunnels between Khajarana Station and Indore Railway Station for Indore Metro Rail Project. (Approx. 5 km) | 1 | Nos | 1,52,60,995 ₹1,52,60,995 | 1,40,38,634 ₹1,40,38,634 Lowest | 1,61,49,985 ₹1,61,49,985 |
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
9 Feb 2026, 4:00 pmClosed
General Manager Contracts
Madhya Pradesh Metro Rail Corporation Limited Admin Building Subhash Nagar MP Metro Deport Bhopal 462023 Madhya Pradesh India
Geotechnical Investigation Study for the Underground Stations and Tunnels between Khajarana Station and Indore Railway Station for Indore Metro Rail Project Approx 5 km
2026_MPMRC_262076_1
50/MPMRCL/2025/Package IN-20
Open Tender
Civil Works - Others
Percentage
120 days
INDORE
As per tender document
4 documents required · 4 mandatory
₹5,000
Madhya Pradesh Metro Rail Corporation Limited
₹3.5 L
Yes
8 Apr 2026
8 Jan 2026
10 Feb 2026
8 Jan 2026
9 Feb 2026
2 Feb 2026
8 Jan 2026 - 16 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedules | |||||
| 1.01 | Schedule-1:
Geotechnical Investigation Study for the Underground Stations and Tunnels between Khajarana Station and Indore Railway Station for Indore Metro Rail Project. (Approx. 5 km) | - | Nos | 1 | - |
stage.html
html • 0.05 MB
technical_303533.pdf
techsummary_303533.pdf
finance_303533.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tenderdocument.pdf
Tender Documents • 3.64 MB
BOQ_303533.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .