| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.6 CrAccepted-AOC 182 VINOBA BASTI NEAR DHAN MANDI GATE SRI GANGANAGAR RAJ SITE ADD 300 5 VYAS MARG RAJA PARK JAIPUR | SRI GANGANAGAR | SRI GANGANAGAR | RAJASTHAN | 302500 | L1 | Accepted-AOC L1 | |
| 2 | L2₹42.8 Cr+₹4.2 Cr (10.9%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹48.7 Cr+₹10.1 Cr (26.3%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹43.2 Cr
EMD Value
₹86.4 L
Closing Date
13 Jun 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
RAM RATAN SHARMA, CEO
RAJASTHAN HERITAGE AUTHORITY, GROUND FLOOR, TOURISM BUILDING, NEAR VIDHAYAKPURI THANA, SANJAY MARG, KHASA KOTHI, JAIPUR-302001
Development of Malseri Dungri at Bhilwara district under PRASAD Scheme. (Rajasthan)
2025_HPPAR_471652_1
06/2025-26
Open Tender
Civil Works
Percentage
365 days
Bhilwara district under PRASAD Scheme. (Rajasthan)
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Department
₹86.4 L
RHA JAIPUR
4 Sept 2025
23 May 2025
17 Jun 2025
23 May 2025
13 Jun 2025
3 Jun 2025
2 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Civil Works BoQ | - | - | - | - |
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 8,456.92 | Cum | 178 | ₹15,05,331.76 |
| 2 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available : Ordinary rock | 2,695.34 | Cum | 268 | ₹7,22,351.12 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 3,891.16 | Cum | 64 | ₹2,49,034.24 |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 3,961.21 | Cum | 3,847 | ₹1,52,38,774.87 |
| 5 | Random rubble dry stone Kharanja under floor. | 1,458.2 | Cum | 932 | ₹13,59,042.4 |
| 6 | Providing and laying in position Ready mix concrete manufactured in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design of specified grade of RCC work including pumping of R.M.C. from transit mixer to site of laying , exculding the cost of centering, shuttering and reinforcement with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. All works upto floor V floor M20 grade Design Mix by using cement as per codal provision. | 3,929.33 | Cum | 6,089 | ₹2,39,25,690.37 |
| 7 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 4,285.53 | Cum | 2,838 | ₹1,21,62,334.14 |
| 8 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 2,622.59 | Sqm | 157 | ₹4,11,746.63 |
| 9 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Columns, pillars, posts and struts etc. | 5,454.08 | Sqm | 375 | ₹20,45,280 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.rar
Tender Documents • 23.88 MB
BOQ.xls
BOQ • 1.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .