Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC AT BHAIRABI SAHI PO TALCHER TOWN PS TALCHER DIST ANGUL 759107 | TALCHER | ANGUL | ODISHA | 759107 | ₹3.7 Cr | L1 | Accepted-AOC Awarded being the L1 bidder. |
| 2 | L2₹3.9 CrRejected-Finance | ₹3.9 Cr | L2 | Rejected-Finance Rejected not being the L1 bidder. |
| 3 | L3₹4.0 CrRejected-Finance | ₹4.0 Cr | L3 | Rejected-Finance Rejected not being the L1 bidder. |
| 4 | L4₹4.1 CrRejected-Finance | ₹4.1 Cr | L4 | Rejected-Finance Rejected not being the L1 bidder. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected by Tender Committee. |
| Sl No | Description | Qty | Unit | GOUTAM CONSTRUCTION L4 | SANJIB KUMAR BHUTIA L1 | M/S. JAY JAGANNATH (JV) L3 | NICPL-SSP JV L2 |
|---|---|---|---|---|---|---|---|
| 1.01 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- III Material | 1,540.2 | cum | 1,790.31 ₹27.6 L | 1,617.75 ₹24.9 L | 1,747.38 ₹26.9 L | 1,400 ₹21.6 L |
| 2.00 | Dry Lean Cement Concrete Sub- base
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect. | 1,540.2 | cum | 2,708.64 ₹41.7 L | 2,435.25 ₹37.5 L | 2,630.39 ₹40.5 L | 2,500 ₹38.5 L |
| 3.00 | Cement Concrete Pavement
Construction of un-reinforced, dowel jointed, plain cement concrete pavement minimum flexural strength - 4.5 Mpa) over a prepared sub base with cement @ 400 kg per cum (minimum), coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a batching and mixing plant as per approved mix design,transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved,curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc. | 3,593.8 | cum | 5,128.4 ₹1.8 Cr | 4,640.25 ₹1.7 Cr | 5,012.08 ₹1.8 Cr | 5,000 ₹1.8 Cr |
| 4.00 | Supplying, fitting and placing un-coated Mild steel reinforcement complete in foundation as per drawing and technical specification and as per relevant clauses of section 1600 | 34.82 | Tonne | 51,719.81 ₹18.0 L | 46,316.25 ₹16.1 L | 50,027.72 ₹17.4 L | 60,000 ₹20.9 L |
| 5.00 | Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 PCC Grade M15 | 80.21 | cum | 4,645 ₹3.7 L | 4,157.25 ₹3.3 L | 4,522.78 ₹3.6 L | 4,500 ₹3.6 L |
| 6.00 | Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 RCC Grade M30 Using Batching Plant, Transit Mixer and Concrete Pump | 541.42 | cum | 5,329.65 ₹28.9 L | 4,754.25 ₹25.7 L | 5,167.62 ₹28.0 L | 5,000 ₹27.1 L |
| 7.00 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications and as per relevant clauses of section 1600 | 55.14 | tonne | 73,746.02 ₹40.7 L | 65,931 ₹36.4 L | 71,214.27 ₹39.3 L | 65,000 ₹35.8 L |
| 8.00 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 2,029.93 | sqm | 123.21 ₹2.5 L | 110.47 ₹2.2 L | 119.32 ₹2.4 L | 130 ₹2.6 L |
| 9.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 65,99,693.37 ₹66.0 L | 59,46,710 ₹59.5 L | 64,27,056.05 ₹64.3 L | 62,66,393.02 ₹62.7 L |
Tender Value
₹5.0 Cr
EMD Value
₹6.2 L
Closing Date
30 Jun 2025, 5:00 pmClosed
Sri Kaushal Kumar
MCL.Jagriti Vihar. Burla. Dist.-Sambalpur. PIN-768020. Odisha. Contact No.9438879957. 0663-2542779
Construction of concrete pavement at truck receiving Hopper (TRH) at Hingula OCP under Hingula Area.
2025_MCL_337479_1
MCL/Samb/Civil-TC/e-Tender /25-26/04 Dated 13.06.2025
Open Tender
Civil Works - Roads
1945 days
Hingula Area, MCL, Odisha. Pin - 759148
As per tender documents
5 documents required · 5 mandatory
₹6.2 L
2 Feb 2026
13 Jun 2025
2 Jul 2025
13 Jun 2025
30 Jun 2025
14 Jun 2025
13 Jun 2025 - 23 Jun 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid