Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-AOC 15 MOULYA NMH LAYOUT 1ST STAGE CHIKKA BANAVARA POST BENGALURU 560 090 | BENGALURU URBAN | KARNATAKA | 560090 | L1 | Accepted-AOC Accepted being L1 | |
| 2 | L2₹50.0 L+₹8,181.02 (0.16%)Rejected-Finance | L2 | Rejected-Finance Rejected. Quoted rates are higher than L1 | |
| 3 | L3₹50.0 L+₹8,584.12 (0.17%)Rejected-Finance | L3 | Rejected-Finance Rejected. Quoted rates are higher than L1 | |
| 4 | L4₹50.2 L+₹24,574.22 (0.49%)Rejected-Finance NO 1C C L C WORKS ROAD NEW COLONY CHROMEPET CHENNAI 600044 | CHENGALPATTU | TAMIL NADU | 600044 | L4 | Rejected-Finance Rejected. Quoted rates are higher than L1 | |
| 5 | L5₹53.4 L+₹3.5 L (6.99%)Rejected-Finance NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L5 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| Sl No | Description | Qty | Unit | Moulya Builders L1 | LAKSHMI ELECTRICAL ENTERPRISES L4 | RAMESH BABU CO L7 | devan enterprises L5 | A.GOVINDARAJ L2 | shashi shekar construction L6 | SREE BUILDERS L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and getting out in any type of soil complete all as specified and as directed. | 34.84 | Cum | 380 ₹13,239.2 | 500 ₹17,420 | 440 ₹15,329.6 | 350 ₹12,194 Lowest | 600 ₹20,904 | 652 ₹22,715.68 | 420 ₹14,632.8 |
| 2.00 | Excavating in trenches, n exc 1.5 m wide and exc 1.5 m, but n exc 3.0 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and getting out in any type of soil complete all as specified and as directed. | 3.6 | Cum | 460 ₹1,656 | 1,200 ₹4,320 | 950 ₹3,420 | 85 ₹306 Lowest | 1,300 ₹4,680 | 1,250 ₹4,500 | 450 ₹1,620 |
| 3.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soils complete all as specified and as directed. | 19.88 | Cum | 96 ₹1,908.48 | 90 ₹1,789.2 | 150 ₹2,982 | 150 ₹2,982 | 125 ₹2,485 | 100 ₹1,988 | 75 ₹1,491 Lowest |
| 4.00 | M&L for cement concrete (1:4:8) Type D2 (using 40 mm graded crushed stone aggregate) in foundations, filling and mass concrete complete all as specified and as directed. | 2 | Cum | 4,200 ₹8,400 | 650 ₹1,300 | 450 ₹900 | 100 ₹200 Lowest | 700 ₹1,400 | 700 ₹1,400 | 4,100 ₹8,200 |
| 5.00 | M&L for Pre-cast cement concrete block masonry, type C1 (1:3:6), (using 20mm graded crushed stone aggregate) with solid blocks, exc. 10 cm in width and setting in cement mortar (1:6), complete all as specified and as directed. | 8.5 | Cum | 7,100 ₹60,350 | 7,200 ₹61,200 | 12,500 ₹1,06,250 | 1,400 ₹11,900 Lowest | 7,300 ₹62,050 | 8,000 ₹68,000 | 7,500 ₹63,750 |
| 6.00 | S&F of TMT bars 5mm dia and over upto and including 10mm dia as in stirrups, spacers and binders including mild steel wire (annealed) not less than 0.9mm dia complete all as specified and as directed. | 150 | Kg | 100 ₹15,000 Lowest | 120 ₹18,000 | 120 ₹18,000 | 110 ₹16,500 | 130 ₹19,500 | 130 ₹19,500 | 110 ₹16,500 |
| 7.00 | M & L for Rolled sections Fe 410-W (Gde E- 250) quality A as in main and cross beams, hip and jack rafters; purlins where connected to common rafters and running rails and guides for sliding doors; fixed with angle cleats or other connecting plates,Nuts,bolts,washer etc complete all as specified and as directed. | 400 | Kg | 136 ₹54,400 | 130 ₹52,000 | 120 ₹48,000 Lowest | 350 ₹1,40,000 | 150 ₹60,000 | 140 ₹56,000 | 145 ₹58,000 |
| 8.00 | S & F for MS Plates Fe 410-W (Gde E- 250) quality A (plain or chequered) channels, square cut or notched (ordinary and counter sunk) forming holes, without any attachmen complete all as specified and as directed. | 405.3 | Kg | 136 ₹55,120.8 | 140 ₹56,742 | 185 ₹74,980.5 | 120 ₹48,636 Lowest | 150 ₹60,795 | 150 ₹60,795 | 145 ₹58,768.5 |
| 9.00 | M&L for reinforced cement concrete M-25 (design mix) using 20mm graded crushed stone aggregate for foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed. | 3.6 | Cum | 6,500 ₹23,400 | 6,800 ₹24,480 | 7,400 ₹26,640 | 9,000 ₹32,400 | 6,700 ₹24,120 | 7,200 ₹25,920 | 6,200 ₹22,320 Lowest |
| 10.00 | M&L for formwork to rough finished surfaces of sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batterrough finished surfaces of concrete measured flat for foundation complete all as specified and as directed. | 25 | Sqm | 380 ₹9,500 | 400 ₹10,000 | 500 ₹12,500 | 850 ₹21,250 | 450 ₹11,250 | 450 ₹11,250 | 350 ₹8,750 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
27 Sept 2025, 6:00 pmClosed
Garrison Engineer M AF Jalahalli
Garrison Engineer M AF Jalahalli-560013
PROVN OF SHELTERED WAITING AREA FOR CH RUN PATIENTS PARKING SHED AC IN ASTRA COMPUTER LAB ADDN ALTN AND SPECIAL REPAIRS TO SECURITY OFFICE AND PROVN OF CERTAIN B AND R WORK SERVICES AT AFTC CQAE WE AND AFS JALAHALLI
2025_MES_729661_1
8199/E8
Open Tender
Civil Works
Item Rate
180 days
Garrison Engineer M AF Jalahalli
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Garrison Engineer M AF Jalahalli
₹1 L
15 Nov 2025
6 Sept 2025
4 Oct 2025
6 Sept 2025
27 Sept 2025
20 Sept 2025
6 Sept 2025 - 13 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .