Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.7 LAccepted-Finance P W D CONTRACTOR CIVIL DISTRICT UMARIA M P | UMARIA | UMARIA | MADHYA PRADESH | L1 | Accepted-Finance BEING L1 | |
| 2 | L2₹72 L+₹7.3 L (11.3%)Rejected-Finance | L2 | Rejected-Finance BEING L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical Disqualified in envelope A due to non submission of EMD | |
| 4 | Rejected-Technical 82 1 WARD NO 08 SHAHPURA DIST DINDORI | DINDORI | MADHYA PRADESH | 481778 | - | Rejected-Technical Disqualified in envelope A due to non submission of hard copy of envelope A | |
| 5 | Rejected-Technical JABALPUR | MADHYA PRADESH | 482001 | - | Rejected-Technical Disqualified in envelope A due to non submission of hard copy of envelope A |
Tender Value
₹80.3 L
EMD Value
₹80,500
Closing Date
22 Feb 2022, 5:30 pmClosed
E.E. WRD Dindori
E.E. WRD Dindori
Construction of flood protection work near Bargaon at Silgi River
2022_WRD_180542_1
869/2021-22/etendering/ Dt. 21-01-2022
Open Tender
Civil Works - Canal
Turn-key
365 days
Dindori
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Yes
₹80,500
Yes
27 Apr 2022
1 Feb 2022
24 Feb 2022
1 Feb 2022
22 Feb 2022
2 Feb 2022
Amount
Construction of flood protection work near Bargaon at Silgi River on Turnkey basis. The work comprising of planning, Survey, , Design, Drawing and Estimate of all components, getting its approval from competent authority, Supervision of all type of works, taking measurements, preparation of bills and establishment of quality control Unit at site during construction of work, monitoring and implementation of all activities of the contractor. After commissioning, trial run, testing, operation and maintenance of Structure and system for 24 months. (Turn Key Basis)
Construction of flood protection work near Bargaon at Silgi River on Turnkey basis. The work comprising of planning, Survey, , Design, Drawing and Estimate of all components, getting its approval from competent authority, Supervision of all type of works, taking measurements, preparation of bills and establishment of quality control Unit at site during construction of work, monitoring and implementation of all activities of the contractor. After commissioning, trial run, testing, operation and maintenance of Structure and system for 24 months. (Turn Key Basis)
MAA BHAGWATI NARAYAN CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .