Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BINNAGURI BIRPARA ROAD OPP MILITARY STATION GATE JALPAIGURI WB | JALPAIGURI | JALPAIGURI | WEST BENGAL | 735203 | Admitted-Finance |
| 2 | Admitted-Finance 5 142 NEHRU STREET AATHIKULAM MADURAI 625 007 | MADURAI | MADURAI | TAMIL NADU | 625007 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹86,000
Closing Date
25 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR DRDA MADURAI -20
DRDA MADURAI -20
MADURAI DISTRICT STRENGTHENING AND BLACK TOPPING OF 2 NOS. OF ROADS IN ALANGANLLUR BLOCK AT MADURAI DISTRICT UNDER TNRRIS 2020 21 ADNL PACKAGE NO 09
2021_RDTN_197049_1
d6/236/2021/TNRRISADNLP/Ala/09
Open Tender
Civil Works
Item Rate
180 days
ALANGANALLUR
Refer Tender document
3 documents required · 3 mandatory
₹0
₹86,000
15 Jun 2022
18 Feb 2021
25 Feb 2021
18 Feb 2021
25 Feb 2021
19 Feb 2021
90 days
Amount
Clearing the scrub jungle with uprooting and including all cuttings depositing of the products, removing from the site disposal by burying etc., complete including all incidental charges as directed by the departmental officers (SSR 301, 302, MOST 201) Km 0/0 - 1/0
Picking the Existing Bituminouse Surface inculding Cost Conveyance of Matrials and Hand Paching to Proper Camber and Compaction of Power roller etc Km 0/0 - 1/0
Earth work excavating and deposting on bank with borrow bits in hard stiff clay,stiff black cotton,hard red earth,shales,murrum,gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layer of 250mm loose thick each, sectioning,watering and compacting etc, complete as per MOST 301-305 Km 0/0 - 1/0
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction watering and compacting by Power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., completeSide berms Km 0/0 - 1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0 - 1/0
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer including cost and conveyance of all materials at site and labour charges including curing etc., completed Km 0/0 - 1/0
Applying PRIMECOAT over WMB/ WMM surface at 2.50 Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer including cost and conveyance of all materials at site and labour charges including curing etc., completed Km 0/0 - 1/0
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete Km 0/0 - 1/0
Suppy and fixing of KILOMETRE (three faces two lines dressed) of size 0.90 x 0.10 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Suppy and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.90 x 0.10 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Provision for Name board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Earth work excavation for Foundation in all clauses of soil, such as gravelly soil, hard stiff clay stiff black cotton soil, hard red earth and earth mixed with 50% of fair sized boulders and hard gravelly soil except sand, silt or other loose soils sandy loam and ordinary soil, hard rock requiring blasting etc.,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Plain CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Supplying and centering shuttering including necessary support for plane surface for RCC column, footing , raft slabs, grade beams ,bed blocks using steel sheets of size 90cmx60cm and 10 gauge stiffened welded with mild steel angles of size 25mmx25mmx3mm for h laid over silver oak(country wood) first size 10cmx6.5cm spaced at about 90cm centre to centre supported by casurinas props of 10cm to 13 cm dia. Spaced at 75cm center complete complying with standard specification as directed by departmental officers (Below G.L)
Plain CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Construction of 4.50 m span RCC slab Culvert CH @ 50m
Dismantling of existing like culverts bridges, Retaining wall
Earth work excavation for Foundation in all clauses of soil, such as gravelly soil, hard stiff clay stiff black cotton soil, hard red earth and earth mixed with 50% of fair sized boulders and hard gravelly soil except sand, silt or other loose soils sandy loam and ordinary soil, hard rock requiring blasting etc.,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Plain CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Supplying and fabraction of TOR steel (s-415) as per 1786 grade (tested) of various daimeter for all RCC works including cost and conveyance of TOR steel and fabraction charges handling charges for the same at both ends including all labour charges for untying straighting cleaning the rods, cutting and bending to shape tying grills with annealed mild steel binding wire joining to obatin required lenght spacing whever necessary with overlaps in the case of rods less than 20mm diameter and above by orc welding as per detailed specification etc complete.
Supplying and centering shuttering including necessary support for plane surface for RCC column, footing , raft slabs, grade beams ,bed blocks using steel sheets of size 90cmx60cm and 10 gauge stiffened welded with mild steel angles of size 25mmx25mmx3mm for h laid over silver oak(country wood) first size 10cmx6.5cm spaced at about 90cm centre to centre supported by casurinas props of 10cm to 13 cm dia. Spaced at 75cm center complete complying with standard specification as directed by departmental officers (Below G.L)
Above GL
Plain CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Plain CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
RCC 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Provision 100 mm PVC Pipe including cost and conveyance of all materials at site and labour charges including curing etc., completed
Supply and fixing of Bitumenpad Inculding all Charges Etc.Complete
Providing and laying of Gravel filling including all cost and conveyance of materials and labour charges etc., complete
Construction of RCC slab Culvert CH @ 800m
Earth work excavation for Foundation in all clauses of soil, such as gravelly soil, hard stiff clay stiff black cotton soil, hard red earth and earth mixed with 50% of fair sized boulders and hard gravelly soil except sand, silt or other loose soils sandy loam and ordinary soil, hard rock requiring blasting etc.,
Plain CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Supplying and centering shuttering including necessary support for plane surface for RCC column, footing , raft slabs, grade beams ,bed blocks using steel sheets of size 90cmx60cm and 10 gauge stiffened welded with mild steel angles of size 25mmx25mmx3mm for h laid over silver oak(country wood) first size 10cmx6.5cm spaced at about 90cm centre to centre supported by casurinas props of 10cm to 13 cm dia. Spaced at 75cm center complete complying with standard specification as directed by departmental officers (Below G.L)
Supplying and fabraction of TOR steel (s-415) as per 1786 grade (tested) of various daimeter for all RCC works including cost and conveyance of TOR steel and fabraction charges handling charges for the same at both ends including all labour charges for untying straighting cleaning the rods, cutting and bending to shape tying grills with annealed mild steel binding wire joining to obatin required lenght spacing whever necessary with overlaps in the case of rods less than 20mm diameter and above by orc welding as per detailed specification etc complete.
Plain CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
RCC 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Clearing the scrub jungle with uprooting and including all cuttings depositing of the products, removing from the site disposal by burying etc., complete including all incidental charges as directed by the departmental officers (SSR 301, 302, MOST 201)
Earth work excavating and deposting on bank with borrow bits in hard stiff clay,stiff black cotton,hard red earth,shales,murrum,gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layer of 250mm loose thick each, sectioning,watering and compacting etc, complete as per MOST 301-305
Picking existing BT surface
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction watering and compacting by Power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., completeSide berms
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0 - 1/0
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer including cost and conveyance of all materials at site and labour charges including curing etc., completed Km 0/0 - 1/0
Applying PRIMECOAT over WMB/ WMM surface at 2.50 Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer including cost and conveyance of all materials at site and labour charges including curing etc., completed Km 0/0 - 1/0
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Repairs of Hard Bed
Plain CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Suppy and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.90 x 0.10 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Suppy and fixing of KILOMETER STONE (three faces two lines dressed) of size 0.90 x 0.10 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Provision for Name board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Provision for Sign board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PERIYASAMY MURALI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .