Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹19.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.4 L+₹1.2 L (6.16%)Admitted-Fee/PreQual/Technical/Finance | ₹20.4 L+₹1.2 L (6.16%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹20.6 L+₹1.4 L (7.46%)Admitted-Fee/PreQual/Technical/Finance | ₹20.6 L+₹1.4 L (7.46%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹20.9 L+₹1.7 L (9.08%)Admitted-Fee/PreQual/Technical/Finance | ₹20.9 L+₹1.7 L (9.08%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹21.7 L+₹2.5 L (13.0%)Admitted-Fee/PreQual/Technical/Finance | ₹21.7 L+₹2.5 L (13.0%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SRI GANESH SERVICES L3 | Sudha Constructions L4 | B RAMAKRISHNA REDDY L1 | SK ENGINEERS AND CONTRACTORS L2 | VIRTUE INTERIOR DESIGNERS AND CONTRACTORS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and laying / fixing vitrified tile flooring including laying of stone dust. | 150 | Sq.m | 2,700 ₹4,77,900 | 2,800 ₹4,95,600 | 1,399 ₹2,47,623 Lowest | 1,949 ₹3,44,973 | 2,500 ₹4,42,500 |
| 2.00 | Providing, cutting and fixing vitrified tile skirting. | 55 | Rm | 760 ₹49,324 | 1,200 ₹77,880 | 716 ₹46,468.4 | 212 ₹13,758.8 Lowest | 300 ₹19,470 |
| 3.00 | Preparing the surface of the screed concrete layer / floor slab | 8 | Sq.m | 3,900 ₹36,816 Lowest | 9,000 ₹84,960 | 9,659 ₹91,180.96 | 5,085 ₹48,002.4 | 5,500 ₹51,920 |
| 4.00 | Providing and constructing Half brick thick masonry wall for the podium area | 22 | Sq.m | 4,000 ₹1,03,840 | 1,800 ₹46,728 | 3,199 ₹83,046.04 | 1,525 ₹39,589 Lowest | 3,000 ₹77,880 |
| 5.00 | Providing and rendering back plaster for newly constructed walls and other repair areas in C.M 1:4 (smooth finish). | 40 | Sq.m | 1,500 ₹70,800 | 720 ₹33,984 | 569 ₹26,856.8 Lowest | 576 ₹27,187.2 | 650 ₹30,680 |
| 6.00 | Providing and making shutters including shelves to the Niche areas of the Room (As per model available in the 4th Floor of DOS department in the MOB) | 29 | Sq.m | 8,300 ₹2,84,026 Lowest | 15,000 ₹5,13,300 | 10,568 ₹3,61,636.96 | 11,440 ₹3,91,476.8 | 8,500 ₹2,90,870 |
| 7.00 | UPVC BAFFLE INTERIOR CEILING WITH INFILL AND INBUILT LIGHTING | 50 | Sq.m | 4,300 ₹2,53,700 Lowest | 7,500 ₹4,42,500 | 9,226 ₹5,44,334 | 9,491 ₹5,59,969 | 7,000 ₹4,13,000 |
| 8.00 | UPVC WINDOWS | 21 | Sq.m | 3,100 ₹76,818 Lowest | 6,600 ₹1,63,548 | 7,889 ₹1,95,489.42 | 7,459 ₹1,84,834.02 | 12,000 ₹2,97,360 |
| 9.00 | CEILING IN THE ROOM EXCEPT FOR THE BAFFLE AREA | 100 | Sq.m | 2,500 ₹2,95,000 | 1,368 ₹1,61,424 Lowest | 2,101 ₹2,47,918 | 3,220 ₹3,79,960 | 4,000 ₹4,72,000 |
| 10.00 | Repainting of entire Room except False Ceiling upon completion of the False ceiling works | 175 | Sq.m | 2,000 ₹4,13,000 | 350 ₹72,275 | 356 ₹73,514 | 225 ₹46,462.5 Lowest | 350 ₹72,275 |
Tender Value
₹21.9 L
Closing Date
4 Aug 2026, 1:00 pmClosed
Regional Director
RBI, Hyderabad
Creation of new DIT Lab at 3rd Floor at Main Office Building, Hyderabad
2026_RBI_284378_1
RBI_HYD_16_07_2026
Limited
Civil Works
Works
RBI
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
5 Aug 2026
16 Jul 2026
5 Aug 2026
16 Jul 2026
4 Aug 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying / fixing vitrified tile flooring including laying of stone dust. | 150 | Sq.m | - | - |
| 2 | Providing, cutting and fixing vitrified tile skirting. | 55 | Rm | - | - |
| 3 | Preparing the surface of the screed concrete layer / floor slab | 8 | Sq.m | - | - |
| 4 | Providing and constructing Half brick thick masonry wall for the podium area | 22 | Sq.m | - | - |
| 5 | Providing and rendering back plaster for newly constructed walls and other repair areas in C.M 1:4 (smooth finish). | 40 | Sq.m | - | - |
| 6 | Providing and making shutters including shelves to the Niche areas of the Room (As per model available in the 4th Floor of DOS department in the MOB) | 29 | Sq.m | - | - |
| 7 | UPVC BAFFLE INTERIOR CEILING WITH INFILL AND INBUILT LIGHTING | 50 | Sq.m | - | - |
| 8 | UPVC WINDOWS | 21 | Sq.m | - | - |
| 9 | CEILING IN THE ROOM EXCEPT FOR THE BAFFLE AREA | 100 | Sq.m | - | - |
| 10 | Repainting of entire Room except False Ceiling upon completion of the False ceiling works | 175 | Sq.m | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TenderDocument.pdf
Tender Documents • 0.95 MB
BOQ_331982.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .