Tender Value
₹59.9 L
EMD Value
₹1.2 L
Closing Date
13 Aug 2026, 2:00 pmClosed
Superintending Engineer
Office of The SE 3rd Circle Irrigation Works, Agra
Construction of Outlets, Boundary Pillers and Kharanja at different Chainages in between Km. 28.800 to Km. 32.400 of Kosi Dy.
2026_UPIDC_1171913_28
07/SE/2026-27
Open Tender
Civil Works
Item Rate
92 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹1.2 L
16 Sept 2026
7 Aug 2026
13 Aug 2026
7 Aug 2026
13 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or excavation in foundation in ordinary soil with back filling including all lead and lift and T&P etc. Complete. | 502.17 | CUM | - | - |
| - | Providing shuttering for C.C. work in foundation i/c all cost of labour & T&P etc complete for proper completion of work. | 249.09 | SQM | - | - |
| - | Laying of Cement Concrete in (1:3:6) with Cement, Coarse Sand, Stone Grit including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 50.92 | CUM | - | - |
| - | Brick work in 1:4 with cement, coarse sand and Ist Class Bricks including cost of all material, labour, T&P, etc. Complete. | 89.11 | Cum | - | - |
| - | Struck deep pointing in 1:2 C.M. On Brick Masonry including cost of all materials, Labour, T&P etc. Complete. | 468.35 | SQM | - | - |
| - | Laying of cement concrete in (1:2:4) with Cement, Coarse Sand, Stone Grit in walls coping including cost of all material, labour, T&P, etc complete. | 4.56 | CUM | - | - |
| - | Providing & fixing 150mm dia inner NP-2 socket hume pipe placing in position with jointing including cost of all materials, labour, T&Ps etc. Complete | 190 | RM | - | - |
| - | Providing, cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work | 318.44 | Kg | - | - |
| - | Laying of cement concrete in (1:1.5:3) with Cement, Coarse Sand, Stone Grit in walls coping including cost of all material, labour, T&P, etc complete. | 3.8 | CUM | - | - |
| - | Finishing walls with acrylic smooth exterior paint of approved brand and manufacturer and required shade on undecorated wall surface to give even shade over 2.20Lt./10Sqm including cost of all materials, labour, T&P etc. complete | 34.2 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
cancelled_1.pdf
pdf • 0.71 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Kosi_5.pdf
Tender Documents • 1.60 MB
BOQ_2208955.xls
BOQ • 0.33 MB
Technical_5.pdf
Additional Documents • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .