Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.0 Cr
EMD Value
₹9.9 L
Closing Date
27 Oct 2026, 10:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE 8th Circle hppwd hamirpur
SE 8th Circle hppwd hamirpur
CO Link Road from Gahra to Luharda via Dukhral From Km 0000 to 3750 Package No HP 03 185 under PMGSY Phase IV Batch I 2025 26) in Distt Hamirpur HP
2026_CEHP_149739_1
PMGSY-IV/2026-27-6184-6221 dated 29.09.2026
Open Tender
Civil Works - Roads
Percentage
455 days
Hamirpur
Please refer Tender documents
10 documents required · 10 mandatory
₹7,000
EE HPPWD Tauni Devi
₹9.9 L
5 Oct 2026
5 Oct 2026
27 Oct 2026
5 Oct 2026
27 Oct 2026
5 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, width cutting and trimming of side slopes to level as shown in the drawing and as directed by Engineer-in-charge at site according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites (to be arranged by the contractor) including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stones to the tune of 4202.94 cubic metre quantity ( four thousand two hundred two point ninety four ) cubic metres at the rate of 300/- (Rupees Three hundred only) per cubic metre shall be effected from the contractor's running bills on pro-rata basis as per actual quantity executed. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 39,402.52 | Per Cubic metre | 237.99 | ₹93,77,405.73 |
| 2 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with in all lifts and leads, transporting to site, spreading, grading by mechanical means to required slope and compacted with three wheel 80-100 (eighty - hundred) kN static roller to meet requirement of Table 300.2 complete as per MORD technical Specification section 400 and as per direction of Engineer-in-charge including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 673 | Per cubic metre | 385.6 | ₹2,59,508.8 |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement including setting out, true to the lines, grades, width and side slopes in accordance with drawing including spreading the embankment material with motor grader in successive layer of in layer 200mm (two hundred millimetre) uniforms thickness and compacting with vibratory roller 8-10 ( eight to ten) tonne static weight to meet requirement of Tables 300.1 and 300.2 as per MORD Technical Specification section 300 and 1600 and as per direction of Engineer-in-charge including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 137.59 | Per cubic metre | 90.9 | ₹12,506.93 |
| 4 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drain and Parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks (Where blasting is prohibited) as per drawings and M.O.R.D. technical specification section 300 and 1600 and as per direction of the Engineer- In – Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto all lead and lift including dressing of sides, bottom and back filling in trenches with excavated suitable approved material to the original surface in layer not executing 150 mm (one hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water ) upto any depth any quantam of water including cleaning of slush which may arise out during dewatering complete as per direction of Engineer-in-Charge. Including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 2,943.1 | Per Cubic metre | 468.7 | ₹13,79,430.97 |
| 5 | Back filling with granular material behind abutments, wing walls, return walls and retaining walls complete as per drawing and M.O.R.D. technical specifications section 1200 and 1600 and as per direction of Engineer – in- Charge including carriage of materials within all leads, lifts and other incidental . The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 193.8 | Per Cubic metre | 1,504.4 | ₹2,91,552.72 |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 of MORTH and as per direction of Engineer – in- Charge including carriage of materials within all leads, lifts and other incidental .The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 2,813.86 | Per Cubic metre | 2,304.1 | ₹64,83,414.83 |
| 7 | Providing, laying and spreading Material on a prepared sub grade, adding the designed quantity of cement to the spread Material, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. as per the entire satisfaction and directions of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 1,710.34 | Per Cubic metre | 2,726.4 | ₹46,63,070.98 |
| 8 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 70-100 (Seventy-Hundred) kg/sqm using mechanical means as per Technical Specification Clause 502. as per the entire satisfaction and directions of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 17,103.36 | Per Square metre | 70.3 | ₹12,02,366.21 |
| 9 | Providing and applying tack coat on the prepared granular surface treated with primer and cleaned with hydraulic broom and spraying tack coat @ 0.25 to 0.30 kg per Square metre as per MORD technical specification section 500, and as per direction of Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, malkana toll tax and other taxes imposed by the Government but excluding GST. | 17,103.36 | Per Square metre | 24 | ₹4,10,480.64 |
| 10 | Providing, laying and rolling of close-graded premix surfacing material of 20 mm (Twenty milimeter) thickness composed of 11.2 mm to 0.9 mm (Eleven point two milimeter to zero point nine milimeter) (Type-A) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 | 17,103.36 | Per Square metre | 286.5 | ₹49,00,112.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_236065.xls
BOQ • 0.45 MB
SBD.pdf
Tender Documents • 1.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .