| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-Finance | L1 | Accepted-Finance LER | |
| 2 | L2₹27.9 L+₹48,889.74 (1.78%)Rejected-Finance | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Venkatesan S L2 | Sivagurunathan L1 |
|---|---|---|---|---|---|
| 1.00Construction of 30000 Liter OHT 12 mtr staging Height Pump Room, Bore well and Extension of pipe line work & Allied works at Jai Green City Mela Chitharkadu in Kadakadappai panchayat. of Thanjavur Union. | |||||
| 2.00Earth work excavation in all class of Soil except hard rock requiring blasting with initial lead and lift etc. Complete for foundation as per SS 20B | |||||
| 3.00 | First depth of 2m | 38.88 | Cu.m | 268.32 ₹10,432.28 | 263.62 ₹10,249.55 Lowest |
| 4.00 | Second depth of 1m | 6.78 | Cu.m | 280.95 ₹1,904.84 | 276.03 ₹1,871.48 Lowest |
| 5.00 | Sand filling with M.Sand filling including cost & conveyance of all materials and all Labour charges etc, Complete.,. | 2.09 | Cu.m | 2,310.38 ₹4,828.69 | 2,269.95 ₹4,744.2 Lowest |
| 6.00 | CC 1:4:8 mix uisng 40 mm ISS HBG Metal including cost & conveyance of all materials and all Labour charges etc, Complete.,. | 3.38 | Cu.m | 6,170.54 ₹20,856.43 | 6,062.56 ₹20,491.45 Lowest |
| 7.00 | CC 1:4:8 mix uisng 20 mm ISS HBG Metal including cost & conveyance of all materials and all Labour charges etc, Complete.,. | 0.22 | Cu.m | 6,693.44 ₹1,472.56 | 6,576.31 ₹1,446.79 Lowest |
| 8.00Reinforced Cement concrete ( M30) using graded aggregates excluding cost of Reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | |||||
| 9.00 | For footing below GL ( 1.50-4.50)below GL | 5.65 | Cu.m | 7,974.99 ₹45,058.69 | 7,835.44 ₹44,270.24 Lowest |
| 10.00 | For Column and brace upto ground level ( 0-1.50)below GL | 1.75 | Cu.m | 7,833.83 ₹13,709.2 | 7,696.75 ₹13,469.31 Lowest |
Tender Value
₹28 L
EMD Value
₹28,000
Closing Date
3 Mar 2026, 3:00 pmClosed
Block Development Officer (VP), Thanjavur
Block Development Office, Thanjavur
Thanjavur District Thanjavur Block Construction of 30000 Liter OHT 12 mtr staging Height Pump Room, Bore well and Extension of pipe line work Allied works at Jai Green City Mela Chitharkadu in Kadakadappai panchayat of Thanjavur Union. Under Peri
2026_RDTN_665875_1
Rc.No.0536/2026/ A3/dated 23.02.2026
Open Tender
Civil Works
Item Rate
6 days
Thanjavur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹28,000
21 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of 30000 Liter OHT 12 mtr staging Height Pump Room, Bore well and Extension of pipe line work & Allied works at Jai Green City Mela Chitharkadu in Kadakadappai panchayat. of Thanjavur Union. | - | - | - | - |
| 2 | Earth work excavation in all class of Soil except hard rock requiring blasting with initial lead and lift etc. Complete for foundation as per SS 20B | - | - | - | - |
| 3 | First depth of 2m | 38.88 | Cu.m | - | - |
| 4 | Second depth of 1m | 6.78 | Cu.m | - | - |
| 5 | Sand filling with M.Sand filling including cost & conveyance of all materials and all Labour charges etc, Complete.,. | 2.09 | Cu.m | - | - |
| 6 | CC 1:4:8 mix uisng 40 mm ISS HBG Metal including cost & conveyance of all materials and all Labour charges etc, Complete.,. | 3.38 | Cu.m | - | - |
| 7 | CC 1:4:8 mix uisng 20 mm ISS HBG Metal including cost & conveyance of all materials and all Labour charges etc, Complete.,. | 0.22 | Cu.m | - | - |
| 8 | Reinforced Cement concrete ( M30) using graded aggregates excluding cost of Reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | - | - | - | - |
| 9 | For footing below GL ( 1.50-4.50)below GL | 5.65 | Cu.m | - | - |
| 10 | For Column and brace upto ground level ( 0-1.50)below GL | 1.75 | Cu.m | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
TechnicalBidgreencity.pdf
Tender Documents • 0.50 MB
BOQ_799778.xls
BOQ • 0.36 MB
PriceBidgreencity.pdf
Additional Documents • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .