Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC 521 SECTOR 11 134109 | PANCHKULA | HARYANA | 134109 | ₹1.6 L Quoted ₹1.7 L | L1 | Accepted-AOC rate after negotiation |
| 2 | L2₹1.7 L+₹6,657.20 (4.01%)Rejected-AOC HSVP NURSERY PHASE I PANCHKULA | PANCHKULA | PANCHKULA | HARYANA | ₹1.7 L+₹6,657.20 (4.01%) | L2 | Rejected-AOC 2nd Lowest |
| 3 | Not Admitted-Fee/PreQual/Technical HARYANA HR | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
13 Apr 2026, 6:55 pmClosed
Nidhi bhardwaj
Horticulture Panchkula
A/mtc of L/s work in HSVP, Nursery , Phase-I, Panchkula for the year 2025-26.( Painting of grill and all other work contingent thereto.)
2026_HBC_513476_1
2026BFCFE8F1 3788 4112 B150 134BC4B90898263HSV
Open Tender
Civil Works
Works
90 days
Panchkula
2 documents required · 2 mandatory
₹250
Yes
₹3,380
Yes
16 May 2026
7 Apr 2026
14 Apr 2026
7 Apr 2026
13 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | Kg. | 83 | - |
| 2 | [30.23.1]White washing with lime to give an even shade : 1. Old work (two or more coats) | - | Sqm | 8 | - |
| 3 | [30.27.1]Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: 1. One or more coats on old work | - | Sqm | 42 | - |
| 4 | [30.28.1]Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 1. One or more coats on old work | - | Sqm | 38 | - |
| 5 | [6.14.2]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | - | cum | 3,875 | - |
| 6 | Repair of grill squire pipe grills with help of welding set and generator and missing of squire pipe, angle , bars complete in all respect . market rate.
Labour for misanalysis works at site. | - | per | 300 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_592297.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .