| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.9 LAccepted-AOC | ₹46.9 L Quoted ₹46.2 L | L1 | Accepted-AOC AOC |
| 2 | L2₹46.9 LRejected-Finance | ₹46.9 L | L2 | Rejected-Finance Rejected Due to Higher Rate |
| 3 | L3₹52.2 LRejected-Finance | ₹52.2 L | L3 | Rejected-Finance Rejected Due to Higher Rate |
| 4 | L4₹53.2 LRejected-Finance | ₹53.2 L | L4 | Rejected-Finance Rejected Due to Higher Rate |
| 5 | L5₹55.3 LRejected-Finance | ₹55.3 L | L5 | Rejected-Finance Rejected Due to Higher Rate |
Tender Value
₹76 L
EMD Value
₹5.8 L
Closing Date
18 Mar 2026, 12:00 pmClosed
ADITYA KUMAR
Sultanpur-Amethi Circle P.W.D. Sultanpur
Construction of Raghunath Lal (Kota) Link Road
2026_CEUFZ_1123645_1
818/1Com-Su.A.Cir/2025-26 Date 28.02.2026
Open Tender
Civil Works
180 days
SULTANPUR
Construction of Raghunath Lal (Kota) Link Road
3 documents required · 3 mandatory
₹2,714
Yes
₹5.8 L
Yes
SULTANPUR
3 Jun 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
14 Mar 2026
Construction of Subgrade:- Construction of sub-grade with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 with lead upto 1000 m as per Technical Specification Clause 303.1
Construction of granular sub-base by providing 12.5 cm.compected well graded material, spreading in uniform layer with motor grader/tractor mounted appropriate equipment on prepared sruface, mixing by mix in place method with rortavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete as per Technical specification clause 401.
Providing and laying 7.50 cm thick G-2 i/c spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, handpacking, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, crushible screening to fill up the interstices of coarse aggregate, watering and compacting, to the required density grading 2 as per technical specification clause 405
Providing and laying 7.50 cm thick G-3 i/c spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, handpacking, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, crushible screening to fill up the interstices of coarse aggregate, watering and compacting, to the required density grading 3 as per technical specification clause 405
Construction of Subgrade and Earthen Shoulders:- Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 with lead upto 1000 m as per Technical Specification Clause 303.1
Brick edging on both side of the road 7.50 cm wide with M-150 class bricks laid on edge with mud mortar including cost of bricks,dressing and ramming the excavated earth in proper slope, all labour, T&P etc for proper completion of the work as per direction of Engineer-in-Charge.
Providing and applying primer coat with Bitumen Emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying Tack coat with VG-10 Grade using emulsion pressure dristibutor at the rate of 0.35 Kg per Sqm on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause 503
Providing, laying and rolling open-graded premix carpet of 20 mm thickness composed of 11.2 mm to 13.2 mm aggregate with 1:2 using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base by manual means, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 Kn Static roller capacity, finished to required level and grades as per Technical Specification Clause 508.
Providing and laying of seal coat by mechanical means with VG-10 Bulk bitumen sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using Type C as per Technical Specification Clause 510.
Earth work in excavation In foundation for Under pipe. for 350 mm dia Hume Pipe
Supply and Fixing of Hume Pipe 350 mm dia in 1:2 cement and fine sand mortar complete job.
Laying of Hume pipe 350 mm dia
05 Years Maintenance Charges
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Tendernotice_2.pdf
PDF • 1.68 MB
BOQ_2093412.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid