Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LQualified 2377 1 NIRALA NAGAR SULTANPUR UTTAR PRADESH 228001 | SULTANPUR | UTTAR PRADESH | 228001 | L1 | Qualified | |
| 2 | L2₹1.5 L+₹42,900 (40.6%)Qualified C 10 23 3RD FLOOR ROHINI SEC 5 SOM BAZAR ROAD ROHINI SECTOR 5 NORTH WEST DELHI DELHI 110085 | NORTH WEST DELHI | DELHI | 110085 | L2 | Qualified | |
| 3 | L3₹1.5 L+₹44,400 (42.0%)Qualified F 3 FIRST FLOOR FAROOQ RESIDENCY MEDICAL ROAD SIR SYED NAGAR ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | L3 | Qualified | |
| 4 | L4₹1.8 L+₹73,740 (69.8%)Qualified 34 122 GANPATI MARKET CHAWAL MANDI CHOWK KANPUR UTTAR PRADESH 208001 | KANPUR NAGAR | UTTAR PRADESH | 208001 | L4 | Qualified | |
| 5 | L5₹2.3 L+₹1.3 L (121.6%)Qualified 109 5A HAZRA ROAD KOLKATA 700026 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | L5 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
19 May 2025, 1:00 pmClosed
Tablet Based Biometric Attendance System (V2) (Q2) MSE Exemption for Turnover Yes Startup Exemption for Turnover Yes Document required from seller Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6214753 Dated : 09-05-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules
the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products
it would be exempted from the "
7822263
GEM/2025/B/6214753
Two Packet Bid
Tablet Based Biometric Attendance System (V2) (Q2) MSE Exemption for Turnover Yes Startup Exemption for Turnover Yes Document required from seller Bidder Turnover
90 days
Kanpur Nagar, Uttar Pradesh
Total value wise evaluation
PRODUCT
5 documents required · 5 mandatory
Exempted
9 May 2025
9 May 2025
19 May 2025
Tablet Based Biometric Attendance System (V2) (Q2) MSE Exemption for Turnover Yes Startup Exemption for Turnover Yes Document required from seller Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6214753 Dated : 09-05-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules
the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products
it would be exempted from the "
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7822263.pdf
GEM_BID
1746774158.pdf
OTHER
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .