| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC B 708 SECTOR C MAHANAGAR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹3.0 Cr Quoted ₹3.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 Cr+₹20.2 L (6.42%)Rejected-Finance | ₹3.3 Cr+₹20.2 L (6.42%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.5 Cr+₹39.6 L (12.6%)Rejected-Finance C BLOCK VISHAL ENCLAVE NEW DELHI 27 | NEW DELHI | DELHI | 110001 | ₹3.5 Cr+₹39.6 L (12.6%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.8 Cr+₹66.9 L (21.3%)Rejected-Finance 221 | HARDOI | UTTAR PRADESH | 209869 | ₹3.8 Cr+₹66.9 L (21.3%) | L4 | Rejected-Finance L4 |
| 5 | L5₹4.2 Cr+₹1.1 Cr (34.8%)Rejected-Finance 11 4 KHANANCHI TOLA HARDOI | ₹4.2 Cr+₹1.1 Cr (34.8%) | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹8.7 L
Closing Date
22 Jan 2025, 12:00 pmClosed
S. E. UNNAO CIRCLE, PWD UNNAO
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
WIDENING AND STRENGTHENING OF SANDI SHAHABAD ROAD (MDR-107C) CHAINAGE- 41.846 TO 43.845 (LENGTH-2.000 KM) WITH FIVE YEARS MAINTENANCE IN F.Y. 2024-25 IN DISTRICT-HARDOI.
2025_CEUCZ_993134_1
6292M/1MT/ E-TENDER/UC/24-25 DATE 04.12.2025
Open Tender
Civil Works
Item Rate
365 days
HARDOI
WIDENING AND STRENGTHENING OF SANDI SHAHABAD ROAD (MDR-107C) CHAINAGE- 41.846 TO 43.845 (LENGTH-2.000 KM) WITH FIVE YEARS MAINTENANCE IN F.Y. 2024-25 IN DISTRICT-HARDOI.
2 documents required · 2 mandatory
₹2,714
₹8.7 L
Yes
S. E. UNNAO CIRCLE, PWD UNNAO
17 Apr 2025
15 Jan 2025
22 Jan 2025
15 Jan 2025
22 Jan 2025
15 Jan 2025
17 Jan 2025
Amount
Construction of Subgrade with Material Obtained from Borrow Pits (For Carted Earth Work) Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2. Including Labour Cess Excluding G.S.T.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. Including Labour Cess Excluding G.S.T.
Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Including Labour Cess Excluding G.S.T.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Including Labour Cess Excluding G.S.T.
Scarifying existing bituminous road surface to a depth of 50 mm and disposal of scraified material within all lifts and lead upto 1000 metres. Including Labour Cess Excluding G.S.T.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including Labour Cess Excluding G.S.T.
Providing, laying, and spreading graded stone aggregate to Stablized wet mix macadam (cement 1% OPC & 3.5% SS Bitumen emulsion by weight of mix. ) and specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, Laying in uniform layers with Paver in Subbase/ Base course on well prepared surface and density Compacting with vibratory roller to achieve the desired Density. Including Labour Cess Excluding G.S.T.
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom . Including Labour Cess Excluding G.S.T.
Providing and laying bituminous concrete(grade-II) with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Including Labour Cess Excluding G.S.T.
Laying of 1000mm Dia Hume pipe Culvert including loading, unloading & cartage up to site and all taxes and also including cost of material all labour T&P etc. Including Labour Cess Excluding G.S.T.
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. Including Labour Cess Excluding G.S.T.
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations . Including Labour Cess Excluding G.S.T.
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. Including Labour Cess Excluding G.S.T.
RCC Grade M 20 Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications. Including Labour Cess Excluding G.S.T.
Providing and laying of weephole in brick massonary in abutment and wing wall with 100mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H towarddrawing force complete as per drawing and technical specification (MORTH &H-13.8/2706&2200), Including Labour Cess Excluding G.S.T.
R.C.C. work cement approved coarse sand, and 2 Cm. (3/4") gauge approved stone ballast in the proportion M-25 in lintels of doors and windows, excluding supply of reinforeement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including neaessary centering and shuttering etc. and also including supply of all materials labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost for:-Including Labour Cess Excluding G.S.T.
Mild steel or iron in plain work such as in reinforced concrete / brick work (when not included in overall rates) wrought to required shape as necessary I/C bending for proper completion of the work and including supply of steel, it's wastage and hooks and authorized over lapping shall be measured. Including Labour Cess Excluding G.S.T.
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Including Labour Cess Excluding G.S.T.
Maintenance of constructed road for next five years after the actual date of completion, the contractor shall be paid total maintenance cost for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor. (Including Labour cess but Excluding GST) (i) Ist Year zero and 2nd year after the actual date of completion @ 0.25% of total Construction cost
(ii) 3rd year @ 0.5% of total Construction cost
(iii) 4th year @ 0.75% of total Construction cost
(iv) 5th year @ 1.0% of total Construction cost
Nar Singh Tomar (BID ID -4871131)
rohit construction company (BID ID -4871277)
M/S SANKAT MOCHAN CONSTRUCTION (BID ID -4872616)
M/S Ram Sewak Har Govind Sahai (BID ID -4873025)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .