| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.9 LAdmitted-Finance HAMIRPUR TEHSIL MARHEEN DISTRICT KATHUA | HAMIRPUR | UTTAR PRADESH | 210301 | -22.70% | ₹24.9 L | L1 | Admitted-Finance |
| 2 | L2₹28.3 L+₹3.4 L (13.8%)Admitted-Finance | -12.00% | ₹28.3 L+₹3.4 L (13.8%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹32.2 L
EMD Value
₹64,413
Closing Date
14 Sept 2026, 2:00 pmClosed
Executive Engineer
Executive Engineer Jal Shakti (PHE) City Div. No.1
Shifting of PHE Utilities at Lok Bhawan Panjtirthi Jammu under Own Sources 2026-27 A Construction of 40000 Glns Sump Tank at Lok Bhawan, Panjtirthi Jammu B Construction of Pump Room at Governor House Panjtirthi Jammu C Shifting of pipe Network oth
2026_PHE_323072_1
E-NIT No. JS/PHECD-1/ 24 of 2026-27
Open Tender
Civil Works
Percentage
60 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
CAO, JMC M/S Performance Security
₹64,413
21 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
14 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A.Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth upto 30 cm measured at a height of 1 m above ground level and
removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | 225 | Sqm | 12.49 | ₹2,810.25 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 204.56 | Cum | 592.9 | ₹1,21,283.62 |
| 3 | )Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 51.14 | Cum | 187.3 | ₹9,578.52 |
| 4 | Providing and laying in position cement concrete of specified grade including curing bu texcluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | cum | 5,202.9 | - |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforced cement concrete work, using cement content as per
approved design mix, including pumping of concrete to site of laying but excluding the
cost of centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improveworkability without impairing strength and durability as per direction of Engineer-incharge.
Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as
per design mix is content considered payable or recoverable separately.
All works upto plinth level | 17.89 | cum | 8,021.1 | ₹1,43,497.48 |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforced cement concrete work, using cement content as per
approved design mix, including pumping of concrete to site of laying but excluding the
cost of centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improveworkability without impairing strength and durability as per direction of Engineer-incharge.
Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as
per design mix is content considered payable or recoverable separately.
All works above plinth level upto floor V level | 19.79 | cum | 9,412.05 | ₹1,86,264.47 |
| 7 | Extra for providing richer mixes at all floor levels. Note:- Excess/ less cement over the
specified cement content used is payable/ recoverable separately.
Providing M-30 grade concrete instead of M-25 grade BMC/RMC.
(Note:- Cement content considered in M-30 is @ 340 kg/cum) | 37.68 | cum | 98.8 | ₹3,722.78 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.57 | cum | 9,821.85 | ₹25,242.15 |
| 9 | Reinforced cement concrete work in arches, archribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.56 | cum | 10,377.15 | ₹78,451.25 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 6.86 | cum | 5,733.6 | ₹39,332.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_1086267.xls
BOQ • 0.36 MB
corie24.pdf
PDF • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .