Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC Work award | |
| 2 | L2₹4.7 L+₹4,714.39 (1.01%)Rejected-Finance WARD NO 2 CHAITANY COLONY MAJRI BASTI POST SHIVAJI NAGAR MAJRI DIST CHANDRAPUR | MAJRI | CHANDRAPUR | MAHARASHTRA | L2 | Rejected-Finance AS L2 | |
| 3 | L3₹5.9 L+₹1.2 L (25.9%)Rejected-Finance NEW MAJRI COLLIERY SHIVJINAGAR TAH BHADRAWATI DIST CHANDRAPUR MAHARASHTRA 445303 | BHADRAWATI | CHANDRAPUR | MAHARASHTRA | 445303 | L3 | Rejected-Finance AS L3 | |
| 4 | L4₹7.4 L+₹2.8 L (59.1%)Rejected-Finance | L4 | Rejected-Finance AS L4 | |
| 5 | L5₹8.0 L+₹3.3 L (71.1%)Rejected-Finance C O GAJANANRAO THERE WARD NO 3 WANI DIST YAVATMAL PIN NO 445304 | YAVATMAL | MAHARASHTRA | 445304 | L5 | Rejected-Finance AS L5 |
Tender Value
₹7.8 L
EMD Value
₹9,800
Closing Date
24 Jun 2022, 4:00 pmClosed
STAFF OFFICER CIVIL WNA
AGM OFFICE SOC WNA PO BHALLAR TAH WANI DIST.YAVATMAL
Maintenance and Planting of Bamboo plants to form green belt along road side of coal stock of Wani railway siding under Kolarpimpri-Pimpalgaon Sub Area
2022_WCL_245908_2
wn4650-civ-e012-2022-23 dt.0606.2022
Open Tender
Civil Works - Others
Item Rate
210 days
Bhallar Township
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,800
19 Aug 2022
9 Jun 2022
25 Jun 2022
10 Jun 2022
24 Jun 2022
10 Jun 2022
10 Jun 2022 - 22 Jun 2022
Amount
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with wtaer, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately ) :- Holes 45 cm dia and 45 cm deep
Supplying and stacking of good earth at site including royalty and carriage upto 1 km (earth measured in stacks will be reduced by 20% for payment)
Supplying and placing healthy and good quality bamboo plants complete as per instruction of Engineer-In-Cahrge.
Manitenance of Bamboo plants by mulching weeding, watering etc on daily basis including cost of tools, hose pipe, mixed with manure (Gander Khad), Linden powder, Themeta, DAP about three times in a period or as per the direction of engg incharge, flooding with water, dressing including removal of rubbish and surplus earth, any, with all leads anf lift etc ail complete, in addition to this, safegaurding, watching of the plants, replacement of dries plants at the cost of contractor and to ensure 100 % survival of the plants with proper growth engaging minimum 02 no labours and minimum 1 trips of water tankers of 5 KL capacity or as per instruction of EIC for period of 180 Days.
Total impact of GST for the purpose of CTC
SUGRIV RAMJI YADAO
REENA YOGENDRA SINGH
SHRI SAI WATOR TANK AND BUILLDING MATERIAL SUPPLIER
Sanjay Kumar Maharaj
M/s Ajit Kumar, Rajura
M/s Murli Singh
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .