Loading…
Loading…
Tender Value
₹2.2 Cr
EMD Value
₹13.0 L
Closing Date
5 Oct 2026, 12:30 pm6d left
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
New Construction work of Nishad Raj Chauraha Babugarh to Nagla Surir Nala via Bamba Patri
2026_CEAGR_1190473_5
4758/14M-AC/2026-27 dated 25-08-2026
Open Tender
Civil Works
Percentage
240 days
Mathura
New Construction
2 documents required · 2 mandatory
₹2,360
₹13.0 L
Yes
Agra
28 Sept 2026
28 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land/Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201./By Manual Means/In area of non-thorny jungle. As per S.I. No. 2.2/2.2/201(I)(A) | 15,400 | Sqm. | 7 | ₹1,07,800 |
| - | Construction of Embankment with Material Obtained from Borrow Pits / Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 3.4 (301.5) | 11,511 | Cum | 110 | ₹12,66,210 |
| - | Excavation in Soil with Hydraulic Excavator with lead upto 100 m / Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. As per S.I. No. 3.5 (302II). | 34,600 | Cum | 37 | ₹12,80,200 |
| - | Construction of Embankment with Material Obtained from Roadway Cutting / Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 3.3/3.3/301.5 | 34,600 | Cum | 58 | ₹20,06,800 |
| - | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site. spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. As per SOR Chapter No. 5 Sl No. 21 | 3,195 | Cum | 100 | ₹3,19,500 |
| - | Providing, Laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base. | 1,520 | Cum | 3,210 | ₹48,79,200 |
| - | Providing, Laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. | 1,443 | Cum | 3,490 | ₹50,36,070 |
| - | Providing & applying Tack Coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.30 Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with air compressor, including all Taxes, Material, Labour, T&P etc required for proper completion of the work, as per MORD specification No. 503 | 14,437 | Sqm. | 24 | ₹3,46,488 |
| - | Providing, laying & rolling of open graded Premix Carpet of 20mm thickness composed of 13.2mm to 5.60mm aggregates including mixing in a suitable plant, laying & rolling with a three wheeled 80-100KN Static Roller capacity, finished to required level & grades Bitumen @ 14.6 Kg./ 10 sqm. area for premixing including all Taxes, Material, Labour and T&P etc required for proper completion of the work, as per MORD specification No. 508. | 14,437 | Sqm. | 203 | ₹29,30,711 |
| - | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A,Type B and Type C as per Technical Specification Clause 510 / A. By Manual Means / Case - III : Type C / (I) Bitumen (S-90). As per MORD Specification No. 5.12/5.12/510(A)(Case - III : Type C)(I) | 14,437 | Sqm. | 77 | ₹11,11,649 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_2244637.xls
BOQ • 0.30 MB
5T2_Chauraha.pdf
Tender Documents • 4.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .