Loading…
Loading…
Tender Value
₹3.4 Cr
EMD Value
₹6.8 L
Closing Date
24 Aug 2026, 4:00 pmDue tomorrow
Superintending Engineer
Superintending Engineer 16th Circle Irrigation work Pratapgarh
Construction of 16 Residences of type-C at Canal Colony in Raebareli district.
2026_UPIDC_1177275_2
04/SE/XVI/2026-27
Open Tender
Civil Works
Item Rate
365 days
Raeebareli.
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,767
₹6.8 L
Yes
18 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
24 Aug 2026
18 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (exceeding 0.30 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. As per direction of Engineer-in-charge. | - | CUM | - | - |
| 2 | Supplying, stacking and filling of local earth (including roylaty) by mechhanical transport upto a lead of 5 km. also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation. As per direction of Engineer-in-charge. | - | CUM | - | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. As per direction of Engineer-in-charge. | - | CUM | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size). As per direction of Engineer-in-charge | - | CUM | - | - |
| 5 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and excluding centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item. UP TO Ground floor. As per direction of Engineer-in-charge. | - | CUM | - | - |
| 6 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and excluding centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item. Ground floor to first floor. As per direction of Engineer-in-charge. | - | CUM | - | - |
| 7 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in slab excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and excluding centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item for ground floor. As per direction of Engineer-in-charge. | - | CUM | - | - |
| 8 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in slab excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and excluding centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item for First floor. As per direction of Engineer-in-charge. | - | CUM | - | - |
| 9 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in beams excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item for Ground floor. As per direction of Engineer-in-charge. | - | CUM | - | - |
| 10 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in beams excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item for First floor. As per direction of Engineer-in-charge. | - | CUM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.05 MB
BOQ_2212390.xls
BOQ • 0.39 MB
bid2.pdf
Tender Documents • 2.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].