Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance BOGDANG NUBRA BOGDANG BOGDANG LEH LEH JAMMU KASHMIR 194401 UDYAM LA 02 0000020 | LEH LADAKH | LADAKH | 194401 | Admitted-Finance |
| 3 | Admitted-Finance R O BOGDANG | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹43.2 L
EMD Value
₹86,500
Closing Date
22 Apr 2022, 2:00 pmClosed
executive engineer ssd nobra
executive engineer ssd nobra
Construction of approach road to Rongdo Bridge.
2022_PWD_6156_9
SSD/N/ of 68 2021-22
Open Tender
Civil Works - Others
Item Rate
30 days
nobra
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Payable To executive engineer ssd nobra
₹86,500
Yes
17 Jun 2022
8 Apr 2022
23 Apr 2022
8 Apr 2022
22 Apr 2022
8 Apr 2022
Amount
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Random rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 grade stone aggerate 20 mm nominal size ) at plinth level with cement mortar 1:6 (1 cement : 6 fine sand )
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone. Quarry
Centering and shuttering including strutting, propping etc. and removal of form for: a) Foundations, footings, bases of columns etc. for mass concrete.
(b) Columns, pillars, piers, abutments, posts and struts.
filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggerate 12.5 mm nominal size) and curing complete
M/S RINCHEN WANGDUS GOVT CONTRACTOR
M/S ABDUL ALI
M/S WANGCHUK SINGAY
M/S TSERING JIKMETH
M/S GHULAM HUSSAIN GOVT CONTRACTOR
M/S TSERING ANGCHUK
M/S STANZIN ZATSAL
M/S MOHD ISSAQ
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .