Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Fee/PreQual/Technical/Finance | -20.99% | ₹4.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹4.8 LAdmitted-Fee/PreQual/Technical/Finance | -20.99% | ₹4.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹5.1 L+₹30,014.56 (6.32%)Admitted-Fee/PreQual/Technical/Finance | -16.00% | ₹5.1 L+₹30,014.56 (6.32%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹5.1 L+₹33,022.03 (6.95%)Admitted-Fee/PreQual/Technical/Finance | -15.50% | ₹5.1 L+₹33,022.03 (6.95%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹5.1 L+₹34,826.52 (7.33%)Admitted-Fee/PreQual/Technical/Finance | -15.20% | ₹5.1 L+₹34,826.52 (7.33%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.0 L
EMD Value
₹17,970
Closing Date
7 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Additional Accomodation (2 Rooms) For Govt Middle school Suggergund
2026_RDPR_323141_1
NIT NO 107 OF 2026-27 GEN
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹17,970
17 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
2 Sept 2026 - 2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: | 9.62 | cum | 256.85 | ₹2,470.9 |
| 2 | P/l of stone soling including all carriages.by MT10km Avg Lead | 5.48 | cum | 1,000 | ₹5,480 |
| 3 | P/l of RBM including all carriages.by MT10km Avg Lead | 6.01 | cum | 850 | ₹5,108.5 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:4:8 using 40mm nominal size aggregate.with | 2.83 | cum | 5,202.9 | ₹14,724.21 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 5.58 | cum | 7,104.35 | ₹39,642.27 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete | 600 | kgs | 115.5 | ₹69,300 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:3:6 using 40mm nominal size aggregate.with 20% Plumusing 40mm n/s agg | 7.83 | cum | 5,673.4 | ₹44,422.72 |
| 8 | Brick work in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) (using availaible bricks from item no 4 and can be used after cleaning and removing of cement from bricks)including brick lintel | 8.68 | cum | 9,027.2 | ₹78,356.1 |
| 9 | wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length including hold fast lugs complete job. | 0.41 | cum | 50,000 | ₹20,500 |
| 10 | Providing and fixing glazed shutters for doors, windows and clerestory windows using 3.5mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws.using KD wood included all necessary items as directed by engineer incharge | 10.22 | sqm | 2,700 | ₹27,594 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1086718.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .