Tender Value
₹49.8 L
EMD Value
₹99,600
Closing Date
26 Sept 2026, 6:00 pm3d left
Major Mrugank Gargate GE(S) Bathinda
GE(S)Bathinda Bathinda Mil Stn
GE(S)BTD 45 OF 2026-27 TERM CONTRACT FOR ARTIFICER WORK UNDER AGE BR-II UNDER GE (SOUTH) BATHINDA AT BATHINDA MILITARY STATION (2ND CALL)
2026_MES_777429_2
GE(S)BTD-45 OF 2026-27
Open Tender
Civil Works
Percentage
330 days
GE(S)Bathinda
Class E Category a(i)
11 documents required · 11 mandatory
₹500
GE(S)Bathinda
₹99,600
GE(S)Bathinda
12 Sept 2026
12 Sept 2026
28 Sept 2026
12 Sept 2026
26 Sept 2026
19 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | To perform under term contract such services and execute such works on the terms and condition contained or referred in the "MES Standard Schedule of Rates 2009 (Part-I) Specification and MES Standard Schedule of Rates 2020 (Part-II) Rates" together with errata/amendments as applicable and upon the conditions contained in tender documents as may be demanded and as are enumerated in the aforesaid MES Standard Schedule of rates during the period of eleven months from the date of acceptance at the rates contained in the aforesaid MES Standard Schedule of rates.
AND
At such other rates as may be fixed under the provision of condition 62 and further agree to refer all disputes as required vide condition-70 of IAFW-2249 (General Condition of contracts IAFW-2249, 1989 print with errata/amendments as applicable) to the 'Sole Arbitrator', a serving officer having degree in Engineering or equivalent or having passed final/direct final Examination of Sub Division II of Institute of Surveyors (India) recognized by the Govt. of India to be appointed by the Chief Engineer, Bathinda Zone, Bathinda Mil Stn in his absence the officer officiating as Chief Engineer, Bathinda Zone Bathinda Mil Stn whose decision shall be final conclusive and binding.
NOTES :- | 1 | JOBS ( Work orders to be placed for works required during currency of contract duly priced on rates as aplicable/mentioned in SSR Part-II subject to percentage rate quoted below) | 49,80,000 | ₹49,80,000 |
| 1.01 | The bidder have to select the option "Excess (+)" OR "Less (-)" available at the cell address E23 of the BOQ to quote the percentage above or below MES Standard Schedule of Rates 2020 respectively. | - | - | - | - |
| 1.02 | The bidder have to insert the amount at the cell address F23 of the BOQ to quote the percentage above or below MES Standard Schedule of Rates 2020. | - | - | - | - |
| 1.03 | If '0 (Zero)' percentage is offered the tender shall be reckoned as net at par with SSR. | - | - | - | - |
| 1.04 | If 'NO' percentage is offered the tender shall be considered as Blank. | - | - | - | - |
| 1.05 | Amount inserted by the MES under rate column and the total amount reflected against Sl No.1 on Page No. 15 of BOQ is a rough guidance and for reference only. Similarly the quoted amount worked out based on percentage rate quoted by the Bidder shall also be treated as rough and for reference only. The acceptance of contract offer shall be done for quoted percentage rate on MES SSR 2020. The work order for various works / services shall be placed for amount worked out/price on the rates contained in MES SSR 2020 Part-II duly adjusted by percentage rate quoted by Bidder. This estimated amount shall be inclusive of (+)/(-) percentage quoted by Contractor. | - | - | - | - |
| 1.06 | Total estimate of any single work, job or services as defined in condition 4A of IAFW-2249 shall not exceed 1,50,000.00. | - | - | - | - |
| 1.07 | Contractor's special attention is invited to condition 4 (A) WORKS TO BE CARRIED OUT (APPLICABLE ONLY TO TERM CONTRACTS) and condition 56 TERMINATION OF CONTRACTS (APPLICABLE ONLY TO TERM CONTRACTS) of IAFW-2249 General Conditions of Contracts are strictly to be followed. | - | - | - | - |
| 1.08 | It is an express condition of this contract that the amount to total works/services required to be done under this contract can vary to any extent irrespective of the amount worked out /mentioned in this BOQ sheet and contractor shall be bound to execute such works/services at the rate contained in MES SSR 2020 Part-II duly adjusted by quoted percentage rate during contract period. No claim of the contractor shall be entertained due to increase or decrease in quantum of work required to be done/work done.The all unservicble debris obtained from excavation, dismantling, demolition and taking down shall be desposed off 100m. The %age quoted by contractor deemed to be included in these aspect. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
TenderdocuGE45_I.pdf
Tender Documents • 0.26 MB
TenderdocuGE45_II.pdf
Tender Documents • 1.02 MB
BOQ_884612.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .