| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.1 LAccepted-AOC | ₹86.1 L | L1 | Accepted-AOC Financial bid accepted |
| 2 | L2₹90.1 LRejected-Finance UTTAR PRADESH UTTAR PRADESH | ₹90.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹97.2 LRejected-Finance MO PATEL NAGAR ORAL | ORAI | ₹97.2 L | L3 | Rejected-Finance L3 |
Tender Value
₹1.4 Cr
EMD Value
₹9.2 L
Closing Date
26 Jan 2026, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Constrction of Patariya to Chirwali link road
2026_CEJNS_1107269_1
130/ 44 C- Jhansi Circle/25 Date 06.01.2026
Open Tender
Civil Works - Roads
365 days
Orai (Jalaun)
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,400
₹9.2 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
16 Feb 2026
19 Jan 2026
26 Jan 2026
19 Jan 2026
26 Jan 2026
19 Jan 2026
22 Jan 2026
Construction of embankment with approved material obtained from local pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Page 3-3)
Laying and spreading soil on a prepared surface, pulverising, mixing the spred soil in place with rotavator with 2% slaked lime having minimum 50% of contents of CaO., Grading with motor grader and copacting with the smooth wheeled road roller at OMC to achieve atleast 98% of the max dry density from a layer of sub-base asd per Ttechnical specification Clause 403.
Providing laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification stabilized with 4% cement including premixing the Material with water at OMC in mechanical mixer(Pug Mill) carriage of mixed Material by tipper to site, l
Providing and applying tack coat with Bitumen VG-10 using bitumin distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Air compressor as per Technical Specification Clause 503. (Page 5-4)
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a sutable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either type A or Type B or Type C as per Technical Sepecification Clause 508. (Page 5-26)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Page 5-52)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 303.1
Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches.
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km.(5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work.
Cement concrete with 4 cm (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion of 6 : 3 : 1 including supply of all materials, labour and T & P etc. required for proper completion of the work.
First class brick work in 1:4 cement and fine sand of 1.25 FM. mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.
12 mm Cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80 mm. In girth and finished even and smooth. No extra for mixing any additive.(1:4) etc
Providing and laying reinforced cement concrete pipe NP-3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, Protection work, back filling, concrete and masonary works in head walls and parapits clause 1106 (350 mm dia)
Providing and laying reinforced cement concrete pipe NP-3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, Protection work, back filling, concrete and masonary works in head walls and parapits clause 1106 (600 mm dia)
Providing and laying reinforced cement concrete pipe NP-3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, Protection work, back filling, concrete and masonary works in head walls and parapits clause 1106 (1000 mm dia)
Supply & fixing Km. Stone/HM Stone/sign Board (Kilometer stone)
Supply & fixing Km. Stone/HM Stone/sign Board (Hectometer stone)
Providing & fixing of reflective signs with a corrosion resistant 4 mm thick aluminium composite panel face to be fully covered with high intensity prismatic sheeting type IV as per IRC-67:2010 retro reflective sheeting with MS angle frame of 35x3. (As per Lucknow SOR Chapter-26, S.No-12)
The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st Year maintinence cost (0.00% Construction Cost)
The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd Year maintinence cost (0.75% Construction Cost)
The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd Year maintinence cost (1.50% Construction Cost)
The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th Year maintinence cost (2.25% Construction Cost)
The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th Year maintinence cost (3.00% Construction Cost)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.25 MB
T2.pdf
Tender Documents • 1.27 MB
BOQ_2043581.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid