| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹21.4 L+₹1.3 L (6.54%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹23.1 L+₹3.0 L (14.7%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹24.3 L+₹4.2 L (20.6%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹26.8 L+₹6.7 L (33.5%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.R.Enterprises L4 | M/S ROHIT CONSTRUCTION L2 | R.S BUILDERS L3 | M/s BSR Construction L1 | JAGDAMBA CONSTRUCTION COMPANY L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n exc 30 cm deep and averaging 15 cm deep and getting out in soft/loose soil complete all as specified and directed. | 275 | Sqm | 25 ₹6,875 Lowest | 25 ₹6,875 Lowest | 38 ₹10,450 | 25 ₹6,875 Lowest | 40 ₹11,000 |
| 2.00 | Excavation over areas n exc 1.5m deep and getting in soft/loose soil complete all as specified and as directed. | 85 | Cum | 130 ₹11,050 | 150 ₹12,750 | 129 ₹10,965 Lowest | 150 ₹12,750 | 280 ₹23,800 |
| 3.00 | ,---ditto--- all as per item No. 2 above but depth exc 1.5m but not exc 3m complete all as specified and directed. | 45 | Cum | 235 ₹10,575 | 155 ₹6,975 Lowest | 199 ₹8,955 | 200 ₹9,000 | 300 ₹13,500 |
| 4.00 | M&L PCC 1:2:4 type B-2 (using 40mm graded stone aggregate) as in as in foundations, filling and mass concrete complete all as specified and directed. | 6 | Cum | 3,200 ₹19,200 | 2,800 ₹16,800 Lowest | 4,509 ₹27,054 | 3,000 ₹18,000 | 5,000 ₹30,000 |
| 5.00 | Use & waste of formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter flat with fair finished surfaces of concrete complete all as specified. | 14 | Sqm | 150 ₹2,100 Lowest | 220 ₹3,080 | 229 ₹3,206 | 300 ₹4,200 | 320 ₹4,480 |
| 6.00 | Use & waste of formwork to faces of walls, retaining walls, abutments, parapets and staircase railings and similar work including attached pillasters, buttresses, etc.; vertical or to batter flat with fair finished surfaces of concrete complete all as specified. | 130 | Sqm | 150 ₹19,500 Lowest | 220 ₹28,600 | 239 ₹31,070 | 390 ₹50,700 | 300 ₹39,000 |
| 7.00 | Use and waste of form work to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work, n exc 200mm thick (Horizontal or sloping) for fair finished flat surfaces of concrete complete all as specified and directed. | 30 | Sqm | 200 ₹6,000 Lowest | 220 ₹6,600 | 279 ₹8,370 | 350 ₹10,500 | 300 ₹9,000 |
| 8.00 | Use and waste of form work to edges of concrete flats, treads, breaks in floors, window cills, concrete railings, openings in concrete walls, floor and roofs n exc 20 cm wide and sides of RCC/PCC bands in walls, horizontal or sloping and similar work exc 10cm but n.exc 20cm wide for fair finished surfaces all as specified and directed. | 28 | RM | 50 ₹1,400 Lowest | 50 ₹1,400 Lowest | 129 ₹3,612 | 100 ₹2,800 | 150 ₹4,200 |
| 9.00 | M & L for RCC M-30 (Design Mix) (using 20mm graded stone aggregate) as in Foundations, including rafts, footings, foundation beams, plinth beams, bases for columns etc, basement slabs, under reamed piles and mass concrete complete all as specified and as directed
Note : Reinforcement & formwork shall be measured and paid for separately. | 23 | Cum | 8,000 ₹1,84,000 | 6,500 ₹1,49,500 | 6,209 ₹1,42,807 | 4,200 ₹96,600 Lowest | 7,900 ₹1,81,700 |
| 10.00 | M & L for RCC M-30 (Design Mix) (using 20mm graded stone aggregate) as in slab supported on walls , beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like complete all as specified and as directed.
Note : Reinforcement & formwork shall be measured and paid for separately. | 6 | Cum | 8,000 ₹48,000 | 6,500 ₹39,000 | 6,209 ₹37,254 | 4,500 ₹27,000 Lowest | 7,900 ₹47,400 |
Tender Value
Refer Docs
EMD Value
₹48,720
Closing Date
5 Aug 2026, 6:00 pmClosed
GE Jaipur
GE Jaipur
ADDN/ALTN OF DRAINAGE SYSTEM IN JADUNATH VIHAR UNDER AGE B/R -I OF GE JAIPUR AT JAIPUR MIL STN
2026_MES_775704_1
GE/J- /2026-27
Open Tender
Civil Works
Item Rate
180 days
GE Jaipur
As per Tender Documents
5 documents required · 5 mandatory
₹500
GE Jaipur
₹48,720
Yes
12 Aug 2026
1 Jul 2026
7 Aug 2026
1 Jul 2026
5 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation n exc 30 cm deep and averaging 15 cm deep and getting out in soft/loose soil complete all as specified and directed. | 275 | Sqm | - | - |
| 2 | Excavation over areas n exc 1.5m deep and getting in soft/loose soil complete all as specified and as directed. | 85 | Cum | - | - |
| 3 | ,---ditto--- all as per item No. 2 above but depth exc 1.5m but not exc 3m complete all as specified and directed. | 45 | Cum | - | - |
| 4 | M&L PCC 1:2:4 type B-2 (using 40mm graded stone aggregate) as in as in foundations, filling and mass concrete complete all as specified and directed. | 6 | Cum | - | - |
| 5 | Use & waste of formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter flat with fair finished surfaces of concrete complete all as specified. | 14 | Sqm | - | - |
| 6 | Use & waste of formwork to faces of walls, retaining walls, abutments, parapets and staircase railings and similar work including attached pillasters, buttresses, etc.; vertical or to batter flat with fair finished surfaces of concrete complete all as specified. | 130 | Sqm | - | - |
| 7 | Use and waste of form work to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work, n exc 200mm thick (Horizontal or sloping) for fair finished flat surfaces of concrete complete all as specified and directed. | 30 | Sqm | - | - |
| 8 | Use and waste of form work to edges of concrete flats, treads, breaks in floors, window cills, concrete railings, openings in concrete walls, floor and roofs n exc 20 cm wide and sides of RCC/PCC bands in walls, horizontal or sloping and similar work exc 10cm but n.exc 20cm wide for fair finished surfaces all as specified and directed. | 28 | RM | - | - |
| 9 | M & L for RCC M-30 (Design Mix) (using 20mm graded stone aggregate) as in Foundations, including rafts, footings, foundation beams, plinth beams, bases for columns etc, basement slabs, under reamed piles and mass concrete complete all as specified and as directed
Note : Reinforcement & formwork shall be measured and paid for separately. | 23 | Cum | - | - |
| 10 | M & L for RCC M-30 (Design Mix) (using 20mm graded stone aggregate) as in slab supported on walls , beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like complete all as specified and as directed.
Note : Reinforcement & formwork shall be measured and paid for separately. | 6 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_868629.xls
BOQ • 0.37 MB
Tender.pdf
Tender Documents • 1.43 MB
Corrigendum1.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .