Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.8 LAccepted-AOC 72 133 THOTTILPATTY SALEM CAMP METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹4.8 L Quoted ₹4.3 L | 1 | Accepted-AOC L1 |
| 2 | 2₹4.4 LRejected-AOC M 7 HOUSING BOARD UNIT MADHAYANKUTTAI PO METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹4.4 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | KSS Engineering Contractor L1 | Tech and Mech Engineers and Erectors L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for transportation, erection of sky climbers and dismantling after completion of overhaul works. Charges for transportation of sky climbers (to & fro). (Including the cost of all consumables & hire charges for T&P's etc.) | 4 | Nos. | 3,455 ₹13,820 Lowest | 3,520 ₹14,080 |
| 2.00 | Charges for erection of sky climbers and dismantling after completion of works.)(Including the cost of all consumables & hire charges for T&P's etc.) | 4 | Nos. | 14,603 ₹58,412 Lowest | 14,880 ₹59,520 |
| 3.00 | Charges for shifting the sky climber inside the furnace for access of Platen Super Heater coils)(Including the cost of all consumables & hire charges for T&P's etc.) | 1 | No | 7,232 ₹7,232 Lowest | 7,440 ₹7,440 |
| 4.00 | Charges for operation of sky climbers required for various works such as cleaning, burner repairing, tube thickness survey, tube repairing works etc., in Boiler )(Including the cost of all consumables & hire charges for T&P's etc.) | 144 | Climber shift | 2,332 ₹3,35,808 Lowest | 2,378 ₹3,42,432 |
| 5.00 | Charges for providing GI sheet/ MS sheet shield for 10.5 mt length inside Boiler inter pass Re Heater area to protect material falling from RH coil slope in to Boiler first pass and dismantling after completion of work and arranging polythene covers to Sky climber motor, sky lock etc. to protect damage from water and dust, cleaning falling soot Particles from Sky climber bed during carrying out overhauling work.)(Including the cost of all consumables & hire charges for T&P's etc.) | 1 | Time | 18,774 ₹18,774 Lowest | 19,025 ₹19,025 |
Tender Value
Refer Docs
EMD Value
₹4,400
Closing Date
19 Aug 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit I Boiler pressure parts AOH 2026 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
2026_EB_694880_1
SE/P and A/SE/M-I/MTPS-I/BM /OT. 03 /2026-27
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹4,400
Yes
25 Aug 2026
17 Aug 2026
20 Aug 2026
17 Aug 2026
19 Aug 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for transportation, erection of sky climbers and dismantling after completion of overhaul works. Charges for transportation of sky climbers (to & fro). (Including the cost of all consumables & hire charges for T&P's etc.) | 4 | Nos. | - | - |
| 2 | Charges for erection of sky climbers and dismantling after completion of works.)(Including the cost of all consumables & hire charges for T&P's etc.) | 4 | Nos. | - | - |
| 3 | Charges for shifting the sky climber inside the furnace for access of Platen Super Heater coils)(Including the cost of all consumables & hire charges for T&P's etc.) | 1 | No | - | - |
| 4 | Charges for operation of sky climbers required for various works such as cleaning, burner repairing, tube thickness survey, tube repairing works etc., in Boiler )(Including the cost of all consumables & hire charges for T&P's etc.) | 144 | Climber shift | - | - |
| 5 | Charges for providing GI sheet/ MS sheet shield for 10.5 mt length inside Boiler inter pass Re Heater area to protect material falling from RH coil slope in to Boiler first pass and dismantling after completion of work and arranging polythene covers to Sky climber motor, sky lock etc. to protect damage from water and dust, cleaning falling soot Particles from Sky climber bed during carrying out overhauling work.)(Including the cost of all consumables & hire charges for T&P's etc.) | 1 | Time | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_835592.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].