| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAdmitted-Finance | ₹3.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.4 Cr+₹7.9 L (2.34%)Admitted-Finance | ₹3.4 Cr+₹7.9 L (2.34%) | L2 | Admitted-Finance |
| 3 | L3₹4.4 Cr+₹1.0 Cr (29.9%)Admitted-Finance | ₹4.4 Cr+₹1.0 Cr (29.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S KIM & SONS CONSTRUCTIONS & EQUIPMENTS L2 | M/s G.Thaninjao R.Naga and Sons L1 | Thokchom Bimolata Devi L3 |
|---|---|---|---|---|---|---|
| 1.00EARTHWORK: | ||||||
| 2.00 | Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5M including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50M (a) All kinds of soil. | 420.92 | cum | 418.51 ₹1,76,159.23 | 408.95 ₹1,72,135.23 Lowest | 531.11 ₹2,23,554.82 |
| 3.00 | Filling available excavated earth ( excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering lead upto 50 m and lift upto 1.5 m | 288.65 | cum | 175.9 ₹50,773.54 | 171.88 ₹49,613.16 Lowest | 223.22 ₹64,432.45 |
| 4.00 | Supplying and filling in plinth with sandy soil under floors including watering, ramming, consolidating and dressing complete. | 410.38 | cum | 807.57 ₹3,31,408.96 | 789.13 ₹3,23,841.59 Lowest | 1,024.84 ₹4,20,571.79 |
| 5.00CEMENT CONCRETE WORKS: | ||||||
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering, shuttering, - All work upto plinth level: (a) 1:4:8(1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size ) | 109.92 | cum | 7,998.46 ₹8,79,158.73 | 7,815.75 ₹8,59,075.98 Lowest | 10,150.33 ₹11,15,683.67 |
| 7.00RE-INFORCED CEMENT CONCRETE WORKS: | ||||||
| 8.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level: | ||||||
| 9.00 | (a) 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 102.87 | cum | 11,159.7 ₹11,47,998.34 | 10,904.78 ₹11,21,774.72 Lowest | 14,162.05 ₹14,56,850.08 |
| 10.00Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajas, lintels, bands, plain window sills, staircases and spiral staircases upto floor five level excluding the cost of centering, shuttering, finishing and reinforcement with | ||||||
Tender Value
₹4.4 Cr
EMD Value
₹8.7 L
Closing Date
9 Apr 2026, 11:00 amClosed
Executive Engineer - Hill I
Office of the Executive Engineer Engg.Cell(H-I) HandFW Dept.
Upgradation of GNM School, Thoubal to College of Nursing, Thoubal.
2026_HFW_3337_1
248/EE/H-1/ENGG.CELL/HFW/
Open Tender
Civil Works
Works
730 days
As Per Tender Document
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Acc No 100210016112809
₹8.7 L
16 Apr 2026
17 Mar 2026
9 Apr 2026
17 Mar 2026
9 Apr 2026
17 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTHWORK: | - | - | - | - |
| 2 | Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5M including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50M (a) All kinds of soil. | 420.92 | cum | 1 | ₹420.92 |
| 3 | Filling available excavated earth ( excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering lead upto 50 m and lift upto 1.5 m | 288.65 | cum | 1 | ₹288.65 |
| 4 | Supplying and filling in plinth with sandy soil under floors including watering, ramming, consolidating and dressing complete. | 410.38 | cum | 1 | ₹410.38 |
| 5 | CEMENT CONCRETE WORKS: | - | - | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering, shuttering, - All work upto plinth level: (a) 1:4:8(1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size ) | 109.92 | cum | 1 | ₹109.92 |
| 7 | RE-INFORCED CEMENT CONCRETE WORKS: | - | - | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level: | - | - | - | - |
| 9 | (a) 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 102.87 | cum | 1 | ₹102.87 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajas, lintels, bands, plain window sills, staircases and spiral staircases upto floor five level excluding the cost of centering, shuttering, finishing and reinforcement with | - | - | - | - |
stage.html
html • 0.03 MB
technical_3623.pdf
techsummary_3623.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.50 MB
BOQ_3623.xls
BOQ • 0.40 MB
Time_Extension2.pdf
PDF • 0.06 MB
Corrigendum.pdf
PDF • 0.22 MB
Time_Extension_1.pdf
PDF • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .